Show simple item record

contributor authorZhang, Angang
contributor authorFan, Zifei
contributor authorZhao, Lun
contributor authorWang, Jincai
contributor authorSong, Heng
date accessioned2022-02-05T22:39:54Z
date available2022-02-05T22:39:54Z
date copyright11/19/2020 12:00:00 AM
date issued2020
identifier issn0195-0738
identifier otherjert_143_8_083005.pdf
identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4277935
description abstractMaterial balance is a basic principle in reservoir engineering, which is still used as a quick and easy analytical tool for reservoir evaluation. In this article, a new methodology of production performance prediction for water-flooding reservoir was proposed based on the material balance principle, which considers the water saturation change caused by water injection and natural water influx, and its effect on transient gas–oil ratio. Among them, the cumulative water production was calculated based on Tong’s water-driver performance curve; the cumulative water influx was obtained by the Fetkovitch method; the transient gas–oil ratio can be acquired by Darcy’s law and Baker’s relative permeability model. Comparisons have been made between the new methodology and commercial reservoir simulator for two different reservoirs. The results show that there is good similarity between these two tools, which verifies the correctness of the new methodology.
publisherThe American Society of Mechanical Engineers (ASME)
titleA New Methodology of Production Performance Prediction for Strong Edge-Water Reservoir
typeJournal Paper
journal volume143
journal issue8
journal titleJournal of Energy Resources Technology
identifier doi10.1115/1.4049020
journal fristpage083005-1
journal lastpage083005-8
page8
treeJournal of Energy Resources Technology:;2020:;volume( 143 ):;issue: 008
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record