YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Computing in Civil Engineering
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Computing in Civil Engineering
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Prototype Integrated Cost and Schedule Control System

    Source: Journal of Computing in Civil Engineering:;1993:;Volume ( 007 ):;issue: 002
    Author:
    Osama Y. Abudayyeh
    ,
    William J. Rasdorf
    DOI: 10.1061/(ASCE)0887-3801(1993)7:2(181)
    Publisher: American Society of Civil Engineers
    Abstract: Effective management of construction projects depends on good access to and control of data, especially data pertaining to cost‐ and schedule‐control functions. Long recognizing the need to integrate these interrelated functions and to improve the quality, integrity, and timeliness of data, researchers have proposed conceptual models to achieve this purpose. However, the proper design and development of an automated solution that would support the needs of integrated cost and schedule control and acquire and store quality data in a timely manner has been lacking. Aware of these deficiencies, we designed and developed a successful prototype of an automated cost‐ and schedule‐control system that is based on the work‐packaging model and that uses bar coding in its data‐acquisition component. The purpose of this paper, then, is to discuss the prototype's capabilities and components and to illustrate how the system is used in controlling cost and schedule of a study case based on an actual construction project.
    • Download: (1.132Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Prototype Integrated Cost and Schedule Control System

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/42755
    Collections
    • Journal of Computing in Civil Engineering

    Show full item record

    contributor authorOsama Y. Abudayyeh
    contributor authorWilliam J. Rasdorf
    date accessioned2017-05-08T21:12:28Z
    date available2017-05-08T21:12:28Z
    date copyrightApril 1993
    date issued1993
    identifier other%28asce%290887-3801%281993%297%3A2%28181%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/42755
    description abstractEffective management of construction projects depends on good access to and control of data, especially data pertaining to cost‐ and schedule‐control functions. Long recognizing the need to integrate these interrelated functions and to improve the quality, integrity, and timeliness of data, researchers have proposed conceptual models to achieve this purpose. However, the proper design and development of an automated solution that would support the needs of integrated cost and schedule control and acquire and store quality data in a timely manner has been lacking. Aware of these deficiencies, we designed and developed a successful prototype of an automated cost‐ and schedule‐control system that is based on the work‐packaging model and that uses bar coding in its data‐acquisition component. The purpose of this paper, then, is to discuss the prototype's capabilities and components and to illustrate how the system is used in controlling cost and schedule of a study case based on an actual construction project.
    publisherAmerican Society of Civil Engineers
    titlePrototype Integrated Cost and Schedule Control System
    typeJournal Paper
    journal volume7
    journal issue2
    journal titleJournal of Computing in Civil Engineering
    identifier doi10.1061/(ASCE)0887-3801(1993)7:2(181)
    treeJournal of Computing in Civil Engineering:;1993:;Volume ( 007 ):;issue: 002
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian