YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Heuristic Methods for Finance-Based and Resource-Constrained Project Scheduling Problem

    Source: Journal of Construction Engineering and Management:;2021:;Volume ( 147 ):;issue: 011::page 04021141-1
    Author:
    Wanlin Liu
    ,
    Jingwen Zhang
    ,
    Wanjun Liu
    DOI: 10.1061/(ASCE)CO.1943-7862.0002174
    Publisher: ASCE
    Abstract: Contractors are often simultaneously subject to capital shortages and resource scarcities in construction projects, forcing them to rely on loans to offset cash deficits during project execution. However, few studies have proposed exact or heuristic methods to deal with the financed-based and resource-constrained project scheduling problem (FBRCPSP). This study aims at developing flexible heuristics for the FBRCPSP. To address the FBRCPSP, a mathematical model is first constructed to maximize a project’s profit considering financing costs, then modified serial schedule scheme (MSSGS) and modified parallel schedule scheme (MPSGS) heuristics are designed to gain a feasible project schedule and its financial plan while complying with feasibilities of the precedence relationship, resource constraints, and credit limits concurrently. Moreover, the proposed heuristics, implemented as part of a genetic algorithm (heuristics-based GA) can be applied to solve the optimization model of the FBRCPSP. In two case studies, the results showed that the heuristics-based GA adequately explored the feasible solution space so that it could obtain the best solutions near those from the integer programming (IP) technique (By optimization software CPLEX version 12.8) and outperformed the previous precedence-preserving GA in terms of solution quality and computational time. Finally, the developed heuristics can devise or update schedules and the corresponding cash flow and resource-demand profiles, helping practitioners achieve expected profits and implement project control.
    • Download: (429.3Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Heuristic Methods for Finance-Based and Resource-Constrained Project Scheduling Problem

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4272018
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorWanlin Liu
    contributor authorJingwen Zhang
    contributor authorWanjun Liu
    date accessioned2022-02-01T21:46:50Z
    date available2022-02-01T21:46:50Z
    date issued11/1/2021
    identifier other%28ASCE%29CO.1943-7862.0002174.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4272018
    description abstractContractors are often simultaneously subject to capital shortages and resource scarcities in construction projects, forcing them to rely on loans to offset cash deficits during project execution. However, few studies have proposed exact or heuristic methods to deal with the financed-based and resource-constrained project scheduling problem (FBRCPSP). This study aims at developing flexible heuristics for the FBRCPSP. To address the FBRCPSP, a mathematical model is first constructed to maximize a project’s profit considering financing costs, then modified serial schedule scheme (MSSGS) and modified parallel schedule scheme (MPSGS) heuristics are designed to gain a feasible project schedule and its financial plan while complying with feasibilities of the precedence relationship, resource constraints, and credit limits concurrently. Moreover, the proposed heuristics, implemented as part of a genetic algorithm (heuristics-based GA) can be applied to solve the optimization model of the FBRCPSP. In two case studies, the results showed that the heuristics-based GA adequately explored the feasible solution space so that it could obtain the best solutions near those from the integer programming (IP) technique (By optimization software CPLEX version 12.8) and outperformed the previous precedence-preserving GA in terms of solution quality and computational time. Finally, the developed heuristics can devise or update schedules and the corresponding cash flow and resource-demand profiles, helping practitioners achieve expected profits and implement project control.
    publisherASCE
    titleHeuristic Methods for Finance-Based and Resource-Constrained Project Scheduling Problem
    typeJournal Paper
    journal volume147
    journal issue11
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)CO.1943-7862.0002174
    journal fristpage04021141-1
    journal lastpage04021141-15
    page15
    treeJournal of Construction Engineering and Management:;2021:;Volume ( 147 ):;issue: 011
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian