YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Time, Cost, and Energy Consumption Analysis on Construction Optimization in High-Rise Buildings

    Source: Journal of Construction Engineering and Management:;2021:;Volume ( 147 ):;issue: 010::page 04021128-1
    Author:
    Wei He
    ,
    Wenjing Li
    ,
    Shan Xu
    ,
    Wei Wang
    ,
    Xu An
    DOI: 10.1061/(ASCE)CO.1943-7862.0002160
    Publisher: ASCE
    Abstract: The multiobjective optimization problems in project management have always been the issues on which project managers focus. Currently, few investigators consider the multiobjective optimization model suitable for high-rise buildings considering energy consumption optimization problems in construction. Nevertheless, the implementation of civil engineering in the construction industry is always an important cause of energy consumption. In this study, construction process analysis (CPA) is used to calculate statistical parameters of the energy consumption in high-rise buildings during the construction stage. Principal component analysis (PCA) is then used to describe the correlation among time, cost, and energy consumption, and also quantifies their interdependence. The statistical analysis illustrates that the correlation between energy consumption and cost is stronger than that between energy consumption and time. And the correlation between cost and time is similar to that between time and energy consumption. Additionally, cost and energy consumption have a positive correlation, cost and time have a negative correlation, and time and energy consumption also have a negative correlation. The major contribution of this study is to provide a time–cost–energy consumption multiobjective optimization model taking account of the different decision preferences of project managers. It could also help project managers create the best combination of project construction activities in practical engineering management. The simulation in a real case is proposed to verify the accuracy of the model. Furthermore, the model could also provide reference value for further construction projects.
    • Download: (2.293Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Time, Cost, and Energy Consumption Analysis on Construction Optimization in High-Rise Buildings

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4272004
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorWei He
    contributor authorWenjing Li
    contributor authorShan Xu
    contributor authorWei Wang
    contributor authorXu An
    date accessioned2022-02-01T21:46:22Z
    date available2022-02-01T21:46:22Z
    date issued10/1/2021
    identifier other%28ASCE%29CO.1943-7862.0002160.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4272004
    description abstractThe multiobjective optimization problems in project management have always been the issues on which project managers focus. Currently, few investigators consider the multiobjective optimization model suitable for high-rise buildings considering energy consumption optimization problems in construction. Nevertheless, the implementation of civil engineering in the construction industry is always an important cause of energy consumption. In this study, construction process analysis (CPA) is used to calculate statistical parameters of the energy consumption in high-rise buildings during the construction stage. Principal component analysis (PCA) is then used to describe the correlation among time, cost, and energy consumption, and also quantifies their interdependence. The statistical analysis illustrates that the correlation between energy consumption and cost is stronger than that between energy consumption and time. And the correlation between cost and time is similar to that between time and energy consumption. Additionally, cost and energy consumption have a positive correlation, cost and time have a negative correlation, and time and energy consumption also have a negative correlation. The major contribution of this study is to provide a time–cost–energy consumption multiobjective optimization model taking account of the different decision preferences of project managers. It could also help project managers create the best combination of project construction activities in practical engineering management. The simulation in a real case is proposed to verify the accuracy of the model. Furthermore, the model could also provide reference value for further construction projects.
    publisherASCE
    titleTime, Cost, and Energy Consumption Analysis on Construction Optimization in High-Rise Buildings
    typeJournal Paper
    journal volume147
    journal issue10
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)CO.1943-7862.0002160
    journal fristpage04021128-1
    journal lastpage04021128-15
    page15
    treeJournal of Construction Engineering and Management:;2021:;Volume ( 147 ):;issue: 010
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian