YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Risk-Based Approach to Predict the Cost Performance of Modularization in Construction Projects

    Source: Journal of Construction Engineering and Management:;2021:;Volume ( 147 ):;issue: 010::page 04021133-1
    Author:
    Mohamad Abdul Nabi
    ,
    Islam H. El-adaway
    DOI: 10.1061/(ASCE)CO.1943-7862.0002159
    Publisher: ASCE
    Abstract: The lack of proper management of the unique modular risks hinders the construction industry from maximizing the potential benefits associated with the use of modularization. Capturing the full cost benefits of modularized processes requires careful consideration of different aspects related to material, design, technology, logistics, installation, and so forth. Although many previous research efforts provided models to assess the feasibility of modularization in construction projects, no previous study developed a risk-based approach to assess the impact of adopting modular approaches on the cost performance of construction projects. This paper fills this knowledge gap. The authors followed an interrelated multistep research methodology. First, 50 modular risks were identified based on an extensive analysis of the literature conducted in a previous research study. Second, an industry survey was conducted in which 48 construction professionals—with an average of 24.25 years experience in construction operations and 13.6 years experience in modular construction—examined and assessed the impact of modular risks on cost performance. Third, integrated statistical and mathematical techniques—including distribution fitting—were utilized to develop a predictive model that (1) maps the 50 modular risks under investigation to cost performance data collected from 56 modular construction projects, and, consequently, (2) computes the associated cost saving and/or growth. The proposed model was verified using extreme condition tests, surprise behavior test, and sensitivity analysis, and was validated by industry experts. The authors provide guidelines for using the proposed model by industry practitioners. The developed model allows for maximized use of available project information to enable a reliable a priori cost assessment for the modularization processes throughout the different project phases. This is particularly important in the case of varying conditions over the project lifecycle. The developed model helps project stakeholders identify cost enablers and barriers that are interrelated with modularization processes. Accordingly, corrective actions and mitigation plans can be established. This research provides improved practices for decision-making, risk management, and project team alignment to maximize the cost benefits of modularization in construction projects.
    • Download: (3.040Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Risk-Based Approach to Predict the Cost Performance of Modularization in Construction Projects

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4272003
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorMohamad Abdul Nabi
    contributor authorIslam H. El-adaway
    date accessioned2022-02-01T21:46:21Z
    date available2022-02-01T21:46:21Z
    date issued10/1/2021
    identifier other%28ASCE%29CO.1943-7862.0002159.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4272003
    description abstractThe lack of proper management of the unique modular risks hinders the construction industry from maximizing the potential benefits associated with the use of modularization. Capturing the full cost benefits of modularized processes requires careful consideration of different aspects related to material, design, technology, logistics, installation, and so forth. Although many previous research efforts provided models to assess the feasibility of modularization in construction projects, no previous study developed a risk-based approach to assess the impact of adopting modular approaches on the cost performance of construction projects. This paper fills this knowledge gap. The authors followed an interrelated multistep research methodology. First, 50 modular risks were identified based on an extensive analysis of the literature conducted in a previous research study. Second, an industry survey was conducted in which 48 construction professionals—with an average of 24.25 years experience in construction operations and 13.6 years experience in modular construction—examined and assessed the impact of modular risks on cost performance. Third, integrated statistical and mathematical techniques—including distribution fitting—were utilized to develop a predictive model that (1) maps the 50 modular risks under investigation to cost performance data collected from 56 modular construction projects, and, consequently, (2) computes the associated cost saving and/or growth. The proposed model was verified using extreme condition tests, surprise behavior test, and sensitivity analysis, and was validated by industry experts. The authors provide guidelines for using the proposed model by industry practitioners. The developed model allows for maximized use of available project information to enable a reliable a priori cost assessment for the modularization processes throughout the different project phases. This is particularly important in the case of varying conditions over the project lifecycle. The developed model helps project stakeholders identify cost enablers and barriers that are interrelated with modularization processes. Accordingly, corrective actions and mitigation plans can be established. This research provides improved practices for decision-making, risk management, and project team alignment to maximize the cost benefits of modularization in construction projects.
    publisherASCE
    titleRisk-Based Approach to Predict the Cost Performance of Modularization in Construction Projects
    typeJournal Paper
    journal volume147
    journal issue10
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)CO.1943-7862.0002159
    journal fristpage04021133-1
    journal lastpage04021133-16
    page16
    treeJournal of Construction Engineering and Management:;2021:;Volume ( 147 ):;issue: 010
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian