YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Integrating Hoisting Efficiency into Construction Site Layout Plan Model for Prefabricated Construction

    Source: Journal of Construction Engineering and Management:;2021:;Volume ( 147 ):;issue: 010::page 04021130-1
    Author:
    Ying Lu
    ,
    Yaqian Zhu
    DOI: 10.1061/(ASCE)CO.1943-7862.0002158
    Publisher: ASCE
    Abstract: Construction site layout plans (CSLP) are vitally significant to prefabricated construction project management; in particular, abundant hoisting operations reinforce the importance of the location of tower cranes and precast component supply points. However, previous studies on CSLP have been conducted on traditional construction sites, and there is a gap in the research regarding the prefabricated construction site layout plan. This paper attempts to establish a comprehensive CSLP model to optimize the facility layout problem on prefabricated construction sites, integrating the hoisting efficiency of precast components into previous studies on CSLP considering safety risks and transportation cost. To solve the proposed multiobjective model, the Genetic algorithms (GAs) is applied to obtain Pareto optimal solutions due to its strong global search capability. To verify the feasibility and effectiveness of the proposed model, a prefabricated residential building project is studied as a case study. This paper attempts to improve the CSLP model for the scene of prefabricated construction in the preconstruction stage to optimize safety risk, transportation cost, and hoisting efficiency, which may facilitate future research attempting to improve the prefabricated construction site layout considering more complex actual situations.
    • Download: (993.8Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Integrating Hoisting Efficiency into Construction Site Layout Plan Model for Prefabricated Construction

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4272002
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorYing Lu
    contributor authorYaqian Zhu
    date accessioned2022-02-01T21:46:20Z
    date available2022-02-01T21:46:20Z
    date issued10/1/2021
    identifier other%28ASCE%29CO.1943-7862.0002158.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4272002
    description abstractConstruction site layout plans (CSLP) are vitally significant to prefabricated construction project management; in particular, abundant hoisting operations reinforce the importance of the location of tower cranes and precast component supply points. However, previous studies on CSLP have been conducted on traditional construction sites, and there is a gap in the research regarding the prefabricated construction site layout plan. This paper attempts to establish a comprehensive CSLP model to optimize the facility layout problem on prefabricated construction sites, integrating the hoisting efficiency of precast components into previous studies on CSLP considering safety risks and transportation cost. To solve the proposed multiobjective model, the Genetic algorithms (GAs) is applied to obtain Pareto optimal solutions due to its strong global search capability. To verify the feasibility and effectiveness of the proposed model, a prefabricated residential building project is studied as a case study. This paper attempts to improve the CSLP model for the scene of prefabricated construction in the preconstruction stage to optimize safety risk, transportation cost, and hoisting efficiency, which may facilitate future research attempting to improve the prefabricated construction site layout considering more complex actual situations.
    publisherASCE
    titleIntegrating Hoisting Efficiency into Construction Site Layout Plan Model for Prefabricated Construction
    typeJournal Paper
    journal volume147
    journal issue10
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)CO.1943-7862.0002158
    journal fristpage04021130-1
    journal lastpage04021130-15
    page15
    treeJournal of Construction Engineering and Management:;2021:;Volume ( 147 ):;issue: 010
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian