YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Network Theory–Driven Construction Logic Knowledge Network: Process Modeling and Application in Highway Projects

    Source: Journal of Construction Engineering and Management:;2021:;Volume ( 147 ):;issue: 010::page 04021114-1
    Author:
    Chau Le
    ,
    H. David Jeong
    ,
    Ivan Damnjanovic
    DOI: 10.1061/(ASCE)CO.1943-7862.0002143
    Publisher: ASCE
    Abstract: Determining a reasonable project duration is one of the most critical activities required by project owner agencies for successful project letting and delivery. Most owner agencies, specifically in the highway sector, mainly rely on schedulers’ judgment and experience in determining the sequence of construction activities to estimate the required amount of time of a project. A vast amount of historical project performance data available in owner agencies’ databases provide rich and reliable resources that can significantly improve the current process to produce a consistent and repeatable quality of construction logic determination. This study proposes a novel data-driven process model utilizing pattern mining, statistical analysis, and network analysis techniques that can detect pairwise logical relationships among construction activities (e.g., Start-Start and Finish-Start) and develop knowledge networks of as-built construction sequence patterns to improve the scheduling process. Three algorithms are proposed to apply the knowledge networks to sequencing a new project: finding immediate predecessors and successors of an activity or ordering a given set of activities. Ten years of historical project data obtained from a state department of transportation were used in this research. A case study reveals that the process model developed in this study can successfully build the most reasonable construction sequences of a highway project, which can significantly improve the scheduling and contract time determination process.
    • Download: (6.684Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Network Theory–Driven Construction Logic Knowledge Network: Process Modeling and Application in Highway Projects

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4271987
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorChau Le
    contributor authorH. David Jeong
    contributor authorIvan Damnjanovic
    date accessioned2022-02-01T21:45:54Z
    date available2022-02-01T21:45:54Z
    date issued10/1/2021
    identifier other%28ASCE%29CO.1943-7862.0002143.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4271987
    description abstractDetermining a reasonable project duration is one of the most critical activities required by project owner agencies for successful project letting and delivery. Most owner agencies, specifically in the highway sector, mainly rely on schedulers’ judgment and experience in determining the sequence of construction activities to estimate the required amount of time of a project. A vast amount of historical project performance data available in owner agencies’ databases provide rich and reliable resources that can significantly improve the current process to produce a consistent and repeatable quality of construction logic determination. This study proposes a novel data-driven process model utilizing pattern mining, statistical analysis, and network analysis techniques that can detect pairwise logical relationships among construction activities (e.g., Start-Start and Finish-Start) and develop knowledge networks of as-built construction sequence patterns to improve the scheduling process. Three algorithms are proposed to apply the knowledge networks to sequencing a new project: finding immediate predecessors and successors of an activity or ordering a given set of activities. Ten years of historical project data obtained from a state department of transportation were used in this research. A case study reveals that the process model developed in this study can successfully build the most reasonable construction sequences of a highway project, which can significantly improve the scheduling and contract time determination process.
    publisherASCE
    titleNetwork Theory–Driven Construction Logic Knowledge Network: Process Modeling and Application in Highway Projects
    typeJournal Paper
    journal volume147
    journal issue10
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)CO.1943-7862.0002143
    journal fristpage04021114-1
    journal lastpage04021114-13
    page13
    treeJournal of Construction Engineering and Management:;2021:;Volume ( 147 ):;issue: 010
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian