YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Performance of Constructed Facilities
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Performance of Constructed Facilities
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Behavior of a 3-Span Continuous Bridge Before and After Continuity Joint Replacement Using Ultra-High-Performance Concrete

    Source: Journal of Performance of Constructed Facilities:;2021:;Volume ( 035 ):;issue: 006::page 04021087-1
    Author:
    Trevor Looney
    ,
    Jeffery Volz
    ,
    Royce Floyd
    DOI: 10.1061/(ASCE)CF.1943-5509.0001667
    Publisher: ASCE
    Abstract: One method of bridge construction consists of simply supported precast, prestressed concrete girders made continuous for live load through individual continuity joints connecting the two girder ends from adjacent spans. However, creep, shrinkage, and thermal effects can create large positive moments in the joints, leading to severe cracking and potential loss of moment transfer. A bridge in Fort Supply, Oklahoma, utilizing this type of connection was slated for joint replacement, and the Oklahoma DOT elected to use ultra-high-performance concrete (UHPC) for the replacement. To evaluate the effectiveness of the UHPC joint, a load test was conducted before and after joint replacement. The bridge was tested by systematically placing dump trucks filled with crushed stone at the midspan of each continuous span. Deflections were monitored for each test, and strains were monitored in two joints using strain gauges embedded in the UHPC joints during construction. While the measured deflections were small, the strain readings from the postrepair test showed that the UHPC joint was able to effectively provide continuity.
    • Download: (6.543Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Behavior of a 3-Span Continuous Bridge Before and After Continuity Joint Replacement Using Ultra-High-Performance Concrete

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4271951
    Collections
    • Journal of Performance of Constructed Facilities

    Show full item record

    contributor authorTrevor Looney
    contributor authorJeffery Volz
    contributor authorRoyce Floyd
    date accessioned2022-02-01T21:44:45Z
    date available2022-02-01T21:44:45Z
    date issued12/1/2021
    identifier other%28ASCE%29CF.1943-5509.0001667.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4271951
    description abstractOne method of bridge construction consists of simply supported precast, prestressed concrete girders made continuous for live load through individual continuity joints connecting the two girder ends from adjacent spans. However, creep, shrinkage, and thermal effects can create large positive moments in the joints, leading to severe cracking and potential loss of moment transfer. A bridge in Fort Supply, Oklahoma, utilizing this type of connection was slated for joint replacement, and the Oklahoma DOT elected to use ultra-high-performance concrete (UHPC) for the replacement. To evaluate the effectiveness of the UHPC joint, a load test was conducted before and after joint replacement. The bridge was tested by systematically placing dump trucks filled with crushed stone at the midspan of each continuous span. Deflections were monitored for each test, and strains were monitored in two joints using strain gauges embedded in the UHPC joints during construction. While the measured deflections were small, the strain readings from the postrepair test showed that the UHPC joint was able to effectively provide continuity.
    publisherASCE
    titleBehavior of a 3-Span Continuous Bridge Before and After Continuity Joint Replacement Using Ultra-High-Performance Concrete
    typeJournal Paper
    journal volume35
    journal issue6
    journal titleJournal of Performance of Constructed Facilities
    identifier doi10.1061/(ASCE)CF.1943-5509.0001667
    journal fristpage04021087-1
    journal lastpage04021087-12
    page12
    treeJournal of Performance of Constructed Facilities:;2021:;Volume ( 035 ):;issue: 006
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian