YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Performance of Constructed Facilities
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Performance of Constructed Facilities
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Deterioration Rates of Building Component Groups Using Nominal Replacement Costs of Components

    Source: Journal of Performance of Constructed Facilities:;2021:;Volume ( 035 ):;issue: 006::page 04021074-1
    Author:
    Vajira Wickramasinghe
    ,
    W. P. S. Dias
    ,
    Sujeeva Setunge
    DOI: 10.1061/(ASCE)CF.1943-5509.0001648
    Publisher: ASCE
    Abstract: Predictive modeling of deterioration is typically done based on visually inspected condition ratings of building components. This paper presents the concept of a cumulative lost value ratio (CLVR) for component groups to track their deterioration with time. The CLVR is computed through the estimated nominal replacement costs and times for the components that form the group in a given building. This eliminates the need for condition surveys and enables a much larger proportion of building assets to be modeled. Data from the City of Melbourne indicated that eight building component groups encapsulated 87% of building value. The similarities observed in their deterioration patterns were used to allocate them into four categories: (1) superstructure; (2) finishes; (3) fittings, plumbing, and water; and (4) air-conditioning, fire, and electrical. Next, for each year, the proportions of buildings with a given component group in each of five CLVR ranges (C1–C5) were established and fitted with Markov deterioration models. The best fits were obtained for the superstructure and finishes groups and also for Conditions C1 and C5.
    • Download: (1.039Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Deterioration Rates of Building Component Groups Using Nominal Replacement Costs of Components

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4271934
    Collections
    • Journal of Performance of Constructed Facilities

    Show full item record

    contributor authorVajira Wickramasinghe
    contributor authorW. P. S. Dias
    contributor authorSujeeva Setunge
    date accessioned2022-02-01T21:44:10Z
    date available2022-02-01T21:44:10Z
    date issued12/1/2021
    identifier other%28ASCE%29CF.1943-5509.0001648.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4271934
    description abstractPredictive modeling of deterioration is typically done based on visually inspected condition ratings of building components. This paper presents the concept of a cumulative lost value ratio (CLVR) for component groups to track their deterioration with time. The CLVR is computed through the estimated nominal replacement costs and times for the components that form the group in a given building. This eliminates the need for condition surveys and enables a much larger proportion of building assets to be modeled. Data from the City of Melbourne indicated that eight building component groups encapsulated 87% of building value. The similarities observed in their deterioration patterns were used to allocate them into four categories: (1) superstructure; (2) finishes; (3) fittings, plumbing, and water; and (4) air-conditioning, fire, and electrical. Next, for each year, the proportions of buildings with a given component group in each of five CLVR ranges (C1–C5) were established and fitted with Markov deterioration models. The best fits were obtained for the superstructure and finishes groups and also for Conditions C1 and C5.
    publisherASCE
    titleDeterioration Rates of Building Component Groups Using Nominal Replacement Costs of Components
    typeJournal Paper
    journal volume35
    journal issue6
    journal titleJournal of Performance of Constructed Facilities
    identifier doi10.1061/(ASCE)CF.1943-5509.0001648
    journal fristpage04021074-1
    journal lastpage04021074-10
    page10
    treeJournal of Performance of Constructed Facilities:;2021:;Volume ( 035 ):;issue: 006
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian