YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Architectural Engineering
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Architectural Engineering
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Assessment of Feasibility, Challenges, and Critical Success Factors of MiC Projects in Hong Kong

    Source: Journal of Architectural Engineering:;2021:;Volume ( 027 ):;issue: 001::page 04020047-1
    Author:
    Shipeng Zhang
    ,
    Xie Rong
    ,
    Beenish Bakhtawar
    ,
    Salman Tariq
    ,
    Tarek Zayed
    DOI: 10.1061/(ASCE)AE.1943-5568.0000452
    Publisher: ASCE
    Abstract: Modular integrated construction (MiC) is a groundbreaking innovative technology, transforming the traditional construction into a value-driven assembly of free-standing volumetric modules that are manufactured in a factory and installed on site. Because MiC has been gaining the attention of local construction stakeholders, it is imperative to assess the feasibility, challenges, and critical success factors (CSFs) for implementing MiC in Hong Kong. Existing literature has disclosed the CSFs from the worldwide perspective, but investigation on the applicability of these generic CSFs in Hong Kong is missing from the existing literature. Therefore, this study has first thoroughly explored the feasibility, challenges, and CSFs through literature synthesis and then shortlisted the CSFs relevant to Hong Kong through structured discussions from MiC researchers in Hong Kong. A questionnaire survey on the relevant factors is then conducted to (1) determine the relative importance of CSFs through pairwise comparisons using an analytical hierarchy process (AHP) by dividing the CSFs into five categories: industry factors, government factors, stakeholder factors, performance-driven factors, and project-specific factors; (2) determine the performance level of each CSF; and (3) quantify the feasibility index of MiC. The CSFs are further validated through expert interviews. The most significant CSFs found using AHP are client’s understanding and willingness, suitable site characteristics and layout, and establishment of government legislation. Experts have also revealed the most significant challenges facing the MiC industry in Hong Kong and provided worthwhile recommendations on improving the contemporary situation. The topmost challenges are limitations of transportation, onsite transportation of MiC modules, and shortage of knowledge and experience. This study has also proposed a useful feasibility index that employs the performance levels and aggregate global weights of CSFs to evaluate the feasibility of MiC projects. Three case studies are carried out to substantiate the effectiveness of the MiC feasibility index. Performance levels of CSFs are calculated for each case study. It is found that the CSFs grouped under the categories of industry factors and government factors need improvement to enhance the feasibility of MiC projects in Hong Kong. In essence, this study provides checklists and valuable guidance to ameliorate the successful implementation of MiC in Hong Kong. The feasibility index is an easy and handy tool for future projects’ implementation and empirical studies.
    • Download: (622.3Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Assessment of Feasibility, Challenges, and Critical Success Factors of MiC Projects in Hong Kong

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4271414
    Collections
    • Journal of Architectural Engineering

    Show full item record

    contributor authorShipeng Zhang
    contributor authorXie Rong
    contributor authorBeenish Bakhtawar
    contributor authorSalman Tariq
    contributor authorTarek Zayed
    date accessioned2022-02-01T00:25:33Z
    date available2022-02-01T00:25:33Z
    date issued3/1/2021
    identifier other%28ASCE%29AE.1943-5568.0000452.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4271414
    description abstractModular integrated construction (MiC) is a groundbreaking innovative technology, transforming the traditional construction into a value-driven assembly of free-standing volumetric modules that are manufactured in a factory and installed on site. Because MiC has been gaining the attention of local construction stakeholders, it is imperative to assess the feasibility, challenges, and critical success factors (CSFs) for implementing MiC in Hong Kong. Existing literature has disclosed the CSFs from the worldwide perspective, but investigation on the applicability of these generic CSFs in Hong Kong is missing from the existing literature. Therefore, this study has first thoroughly explored the feasibility, challenges, and CSFs through literature synthesis and then shortlisted the CSFs relevant to Hong Kong through structured discussions from MiC researchers in Hong Kong. A questionnaire survey on the relevant factors is then conducted to (1) determine the relative importance of CSFs through pairwise comparisons using an analytical hierarchy process (AHP) by dividing the CSFs into five categories: industry factors, government factors, stakeholder factors, performance-driven factors, and project-specific factors; (2) determine the performance level of each CSF; and (3) quantify the feasibility index of MiC. The CSFs are further validated through expert interviews. The most significant CSFs found using AHP are client’s understanding and willingness, suitable site characteristics and layout, and establishment of government legislation. Experts have also revealed the most significant challenges facing the MiC industry in Hong Kong and provided worthwhile recommendations on improving the contemporary situation. The topmost challenges are limitations of transportation, onsite transportation of MiC modules, and shortage of knowledge and experience. This study has also proposed a useful feasibility index that employs the performance levels and aggregate global weights of CSFs to evaluate the feasibility of MiC projects. Three case studies are carried out to substantiate the effectiveness of the MiC feasibility index. Performance levels of CSFs are calculated for each case study. It is found that the CSFs grouped under the categories of industry factors and government factors need improvement to enhance the feasibility of MiC projects in Hong Kong. In essence, this study provides checklists and valuable guidance to ameliorate the successful implementation of MiC in Hong Kong. The feasibility index is an easy and handy tool for future projects’ implementation and empirical studies.
    publisherASCE
    titleAssessment of Feasibility, Challenges, and Critical Success Factors of MiC Projects in Hong Kong
    typeJournal Paper
    journal volume27
    journal issue1
    journal titleJournal of Architectural Engineering
    identifier doi10.1061/(ASCE)AE.1943-5568.0000452
    journal fristpage04020047-1
    journal lastpage04020047-16
    page16
    treeJournal of Architectural Engineering:;2021:;Volume ( 027 ):;issue: 001
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian