YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Environmental Engineering
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Environmental Engineering
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Pilot-Scale Investigation of Floating Treatment Wetlands as Retrofits to Waste-Stabilization Ponds for Efficient Domestic Wastewater Treatment

    Source: Journal of Environmental Engineering:;2021:;Volume ( 147 ):;issue: 006::page 04021014-1
    Author:
    Roya Pishgar
    ,
    Christopher L. Banmann
    ,
    Angus Chu
    DOI: 10.1061/(ASCE)EE.1943-7870.0001872
    Publisher: ASCE
    Abstract: This study investigates the efficacy of floating treatment wetlands (FTWs) for retrofitting waste-stabilization ponds (WSPs) operating in cold continental climates, such that in Alberta, Canada. The objective was to determine whether WSPs augmented with FTWs could achieve equal or superior treatment efficiency at shorter hydraulic retention times (HRTs of 25–45 days) than those required in the conventional WSPs (60–365 days). A field study was carried out on treatment of domestic wastewater in a two-stage pilot-scale FTW mesocosm (i.e., FTW treatment train composed of Stage 1 and Stage 2 FTW cells (S1-FTW→S2-FTW), with an overall volume of 84 m3 and 41.85  m3 per cell). An identical system without FTW served as a control (i.e., control treatment train of S1-C→S2-C). Overall, the FTW-augmented WSP system achieved greater treatment of 5-day biochemical oxygen demand (BOD5), total suspended solids (TSS), total nitrogen (TN), ammonium nitrogen (NH4+-N), dissolved reactive phosphorus (DRP), and total phosphorus (TP) than the control. The corresponding removal efficiencies were 91.5% versus 85.0%, 91.3% versus 87.7%, 85.0% versus 75.6%, 93.9% versus 86.1%, 77.6% versus 57.7%, and 75.8% versus 58.7%, with a statistically significant difference (p<0.05) for all except TSS. This difference in performance resulted from the better performance of the Stage 1 FTW cell for BOD5, TN, and NH4+-N removal, and the Stage 2 FTW cell for DRP and TP removal. Simultaneous nitrification-denitrification (SND) occurred in the FTW treatment train, whereas only nitrification occurred in the control treatment train, which resulted in statistically higher TN removal efficiency in the former. Contribution of plant uptake to phosphorus removal was marginal (6.76%) and adsorption-desorption on solid particles was assumed to be the major removal pathway. The FTWs generally decreased the physicochemical parameters, with stronger effects on diurnal variations than seasonal fluctuations. The effect of FTW on daily physicochemical conditions played a key role in superior performance of FTW treatment.
    • Download: (4.060Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Pilot-Scale Investigation of Floating Treatment Wetlands as Retrofits to Waste-Stabilization Ponds for Efficient Domestic Wastewater Treatment

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4271142
    Collections
    • Journal of Environmental Engineering

    Show full item record

    contributor authorRoya Pishgar
    contributor authorChristopher L. Banmann
    contributor authorAngus Chu
    date accessioned2022-02-01T00:14:53Z
    date available2022-02-01T00:14:53Z
    date issued6/1/2021
    identifier other%28ASCE%29EE.1943-7870.0001872.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4271142
    description abstractThis study investigates the efficacy of floating treatment wetlands (FTWs) for retrofitting waste-stabilization ponds (WSPs) operating in cold continental climates, such that in Alberta, Canada. The objective was to determine whether WSPs augmented with FTWs could achieve equal or superior treatment efficiency at shorter hydraulic retention times (HRTs of 25–45 days) than those required in the conventional WSPs (60–365 days). A field study was carried out on treatment of domestic wastewater in a two-stage pilot-scale FTW mesocosm (i.e., FTW treatment train composed of Stage 1 and Stage 2 FTW cells (S1-FTW→S2-FTW), with an overall volume of 84 m3 and 41.85  m3 per cell). An identical system without FTW served as a control (i.e., control treatment train of S1-C→S2-C). Overall, the FTW-augmented WSP system achieved greater treatment of 5-day biochemical oxygen demand (BOD5), total suspended solids (TSS), total nitrogen (TN), ammonium nitrogen (NH4+-N), dissolved reactive phosphorus (DRP), and total phosphorus (TP) than the control. The corresponding removal efficiencies were 91.5% versus 85.0%, 91.3% versus 87.7%, 85.0% versus 75.6%, 93.9% versus 86.1%, 77.6% versus 57.7%, and 75.8% versus 58.7%, with a statistically significant difference (p<0.05) for all except TSS. This difference in performance resulted from the better performance of the Stage 1 FTW cell for BOD5, TN, and NH4+-N removal, and the Stage 2 FTW cell for DRP and TP removal. Simultaneous nitrification-denitrification (SND) occurred in the FTW treatment train, whereas only nitrification occurred in the control treatment train, which resulted in statistically higher TN removal efficiency in the former. Contribution of plant uptake to phosphorus removal was marginal (6.76%) and adsorption-desorption on solid particles was assumed to be the major removal pathway. The FTWs generally decreased the physicochemical parameters, with stronger effects on diurnal variations than seasonal fluctuations. The effect of FTW on daily physicochemical conditions played a key role in superior performance of FTW treatment.
    publisherASCE
    titlePilot-Scale Investigation of Floating Treatment Wetlands as Retrofits to Waste-Stabilization Ponds for Efficient Domestic Wastewater Treatment
    typeJournal Paper
    journal volume147
    journal issue6
    journal titleJournal of Environmental Engineering
    identifier doi10.1061/(ASCE)EE.1943-7870.0001872
    journal fristpage04021014-1
    journal lastpage04021014-18
    page18
    treeJournal of Environmental Engineering:;2021:;Volume ( 147 ):;issue: 006
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian