YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Optimizing the Renovation Scheduling of Leased Residential Buildings to Minimize Total Project Cost

    Source: Journal of Construction Engineering and Management:;2021:;Volume ( 147 ):;issue: 007::page 04021074-1
    Author:
    Mansour AlOtaibi
    ,
    Khaled El-Rayes
    ,
    Ayman Altuwaim
    DOI: 10.1061/(ASCE)CO.1943-7862.0002063
    Publisher: ASCE
    Abstract: This paper presents the development of a novel model for optimizing the scheduling of renovation projects for leased residential buildings. The computations of the developed model are executed using an optimization module that identifies an optimal renovation schedule that minimizes total renovation cost, a scheduling module that calculates the start and finish dates of each activity in all residential units, and a cost module that estimates the total renovation cost of each generated solution in the optimization module. A real-life case study of a residential renovation project is analyzed to compare the generated results by the model to those provided by two available models and three current industry practices. The outcome of this analysis confirms that the model was able to reduce the total renovation cost of the case study by 3.6%–4% compared to available models/practices. Furthermore, the results of the case study clearly illustrate the novel contributions of the model and its unique capability of complying with all relevant constraints, including the unit availability date, identifying an optimal project start date and an optimal unit renovation sequence for all leased residential units and minimizing the total renovation cost of leased residential buildings.
    • Download: (1.562Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Optimizing the Renovation Scheduling of Leased Residential Buildings to Minimize Total Project Cost

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4271036
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorMansour AlOtaibi
    contributor authorKhaled El-Rayes
    contributor authorAyman Altuwaim
    date accessioned2022-02-01T00:10:54Z
    date available2022-02-01T00:10:54Z
    date issued7/1/2021
    identifier other%28ASCE%29CO.1943-7862.0002063.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4271036
    description abstractThis paper presents the development of a novel model for optimizing the scheduling of renovation projects for leased residential buildings. The computations of the developed model are executed using an optimization module that identifies an optimal renovation schedule that minimizes total renovation cost, a scheduling module that calculates the start and finish dates of each activity in all residential units, and a cost module that estimates the total renovation cost of each generated solution in the optimization module. A real-life case study of a residential renovation project is analyzed to compare the generated results by the model to those provided by two available models and three current industry practices. The outcome of this analysis confirms that the model was able to reduce the total renovation cost of the case study by 3.6%–4% compared to available models/practices. Furthermore, the results of the case study clearly illustrate the novel contributions of the model and its unique capability of complying with all relevant constraints, including the unit availability date, identifying an optimal project start date and an optimal unit renovation sequence for all leased residential units and minimizing the total renovation cost of leased residential buildings.
    publisherASCE
    titleOptimizing the Renovation Scheduling of Leased Residential Buildings to Minimize Total Project Cost
    typeJournal Paper
    journal volume147
    journal issue7
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)CO.1943-7862.0002063
    journal fristpage04021074-1
    journal lastpage04021074-13
    page13
    treeJournal of Construction Engineering and Management:;2021:;Volume ( 147 ):;issue: 007
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian