YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Implementation of a BIM-FM Platform at an International Airport Project: Case Study

    Source: Journal of Construction Engineering and Management:;2021:;Volume ( 147 ):;issue: 004::page 05021002-1
    Author:
    Behlul Kula
    ,
    Esin Ergen
    DOI: 10.1061/(ASCE)CO.1943-7862.0002025
    Publisher: ASCE
    Abstract: Despite that the need to develop an integrated building information modeling–facility management (BIM-FM) system is often emphasized in the literature, real-life implementation case studies focusing on large-scale facilities are scarce. The goal of this paper is to describe the capacities of building information modeling (BIM) in the facility management (FM) phase by presenting the experience gained during the development and utilization of BIM-FM platform at a large-scale facility and to illustrate technical challenges and lessons learned from the perspective of practitioners. The selected case is an international airport facility, in which a BIM-FM platform was implemented and used in the FM phase for 4  years. Two data collection methods were used in the case study: (1) interviews with the project team; and (2) investigation of documents, models, and BIM-FM platform. The main contribution of this paper is that it provides qualitative insights on how BIM-FM integration was performed in a large-scale project, including BIM-FM platform selection and development processes, and identifying the technical challenges and lessons learned that were observed through the utilization and maintenance of a BIM-FM platform. The findings of the case study can be used by the practitioners to effectively adopt BIM in the FM phase, and by academics to understand the challenges and to develop related approaches.
    • Download: (966.0Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Implementation of a BIM-FM Platform at an International Airport Project: Case Study

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4271000
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorBehlul Kula
    contributor authorEsin Ergen
    date accessioned2022-02-01T00:09:28Z
    date available2022-02-01T00:09:28Z
    date issued4/1/2021
    identifier other%28ASCE%29CO.1943-7862.0002025.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4271000
    description abstractDespite that the need to develop an integrated building information modeling–facility management (BIM-FM) system is often emphasized in the literature, real-life implementation case studies focusing on large-scale facilities are scarce. The goal of this paper is to describe the capacities of building information modeling (BIM) in the facility management (FM) phase by presenting the experience gained during the development and utilization of BIM-FM platform at a large-scale facility and to illustrate technical challenges and lessons learned from the perspective of practitioners. The selected case is an international airport facility, in which a BIM-FM platform was implemented and used in the FM phase for 4  years. Two data collection methods were used in the case study: (1) interviews with the project team; and (2) investigation of documents, models, and BIM-FM platform. The main contribution of this paper is that it provides qualitative insights on how BIM-FM integration was performed in a large-scale project, including BIM-FM platform selection and development processes, and identifying the technical challenges and lessons learned that were observed through the utilization and maintenance of a BIM-FM platform. The findings of the case study can be used by the practitioners to effectively adopt BIM in the FM phase, and by academics to understand the challenges and to develop related approaches.
    publisherASCE
    titleImplementation of a BIM-FM Platform at an International Airport Project: Case Study
    typeJournal Paper
    journal volume147
    journal issue4
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)CO.1943-7862.0002025
    journal fristpage05021002-1
    journal lastpage05021002-14
    page14
    treeJournal of Construction Engineering and Management:;2021:;Volume ( 147 ):;issue: 004
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian