description abstractThe complexity of the pairwise comparison process in the analytic hierarchy process (AHP) and the limitation of consistency are challenges that need to be addressed when there are many evaluation factors. An improved AHP is established by integrating the grey correlation model (GCM) and AHP, for which the tedious pairwise comparison process can be abandoned. The improved method integrates the advantages of grey system theory (GST) and AHP, overcomes the inherent limitations of AHP, and can be used to analyze many different types of problems that were previously analyzed by AHP or GST. In this paper, the improvement process is presented in detail, and the effectiveness of the improved AHP method is verified through several existing examples. This work uses the case of the Suning Square project in Langfang, Hebei Province, China, to apply the proposed improved AHP to construct a comprehensive evaluation system. The proposed method is used to evaluate the construction risk of foundation pit excavation, thereby providing technical guidance for efficient implementation of the project.
publisherASCE
titleImprovement of Analytic Hierarchy Process Based on Grey Correlation Model and Its Engineering Application
typeJournal Paper
journal volume7
journal issue2
journal titleASCE-ASME Journal of Risk and Uncertainty in Engineering Systems, Part A: Civil Engineering
identifier doi10.1061/AJRUA6.0001126
journal fristpage04021007-1
journal lastpage04021007-12
page12
treeASCE-ASME Journal of Risk and Uncertainty in Engineering Systems, Part A: Civil Engineering:;2021:;Volume ( 007 ):;issue: 002
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record