YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Pipeline Systems Engineering and Practice
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Pipeline Systems Engineering and Practice
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Grouting Methods in Manhole Rehabilitations at Coastal Areas: Case Study

    Source: Journal of Pipeline Systems Engineering and Practice:;2021:;Volume ( 012 ):;issue: 003::page 05021003-1
    Author:
    Zihao Zhu
    ,
    Baosong Ma
    ,
    Wenfang Wu
    ,
    Yahong Zhao
    ,
    Tie Wang
    ,
    Cong Zeng
    DOI: 10.1061/(ASCE)PS.1949-1204.0000542
    Publisher: ASCE
    Abstract: For underground structures at coastal areas, inflow/infiltration (I/I) control is a critical procedure to guarantee their quality, especially for manholes, which are more likely to have structural problems and I/I problems. There are several methods that could address these problems, including spraying, grouting, and in situ lining. In this case study, a combined grouting method is proposed for a deep-buried double-walled manhole rehabilitation project, the Diyar Al Muharraq (DAM) project in Bahrain. This case study involves I/I investigation, rehabilitation design, construction management, and evaluation of rehabilitation according to the monitoring data. The 4-step grouting method shows an excellent rehabilitation performance, the monitoring data show that the water level in manholes lowered by 21.35%, and the brine pressure at the bottom of manholes decreased by 78.26%, which means the combined grouting method is effective for manhole rehabilitation at coastal areas.
    • Download: (4.538Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Grouting Methods in Manhole Rehabilitations at Coastal Areas: Case Study

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4270206
    Collections
    • Journal of Pipeline Systems Engineering and Practice

    Show full item record

    contributor authorZihao Zhu
    contributor authorBaosong Ma
    contributor authorWenfang Wu
    contributor authorYahong Zhao
    contributor authorTie Wang
    contributor authorCong Zeng
    date accessioned2022-01-31T23:42:24Z
    date available2022-01-31T23:42:24Z
    date issued8/1/2021
    identifier other%28ASCE%29PS.1949-1204.0000542.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4270206
    description abstractFor underground structures at coastal areas, inflow/infiltration (I/I) control is a critical procedure to guarantee their quality, especially for manholes, which are more likely to have structural problems and I/I problems. There are several methods that could address these problems, including spraying, grouting, and in situ lining. In this case study, a combined grouting method is proposed for a deep-buried double-walled manhole rehabilitation project, the Diyar Al Muharraq (DAM) project in Bahrain. This case study involves I/I investigation, rehabilitation design, construction management, and evaluation of rehabilitation according to the monitoring data. The 4-step grouting method shows an excellent rehabilitation performance, the monitoring data show that the water level in manholes lowered by 21.35%, and the brine pressure at the bottom of manholes decreased by 78.26%, which means the combined grouting method is effective for manhole rehabilitation at coastal areas.
    publisherASCE
    titleGrouting Methods in Manhole Rehabilitations at Coastal Areas: Case Study
    typeJournal Paper
    journal volume12
    journal issue3
    journal titleJournal of Pipeline Systems Engineering and Practice
    identifier doi10.1061/(ASCE)PS.1949-1204.0000542
    journal fristpage05021003-1
    journal lastpage05021003-12
    page12
    treeJournal of Pipeline Systems Engineering and Practice:;2021:;Volume ( 012 ):;issue: 003
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian