YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Management in Engineering
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Management in Engineering
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Understanding the Key Risks Affecting Cost and Schedule Performance of Modular Construction Projects

    Source: Journal of Management in Engineering:;2021:;Volume ( 037 ):;issue: 004::page 04021023-1
    Author:
    Mohamad Abdul Nabi
    ,
    Islam H. El-adaway
    DOI: 10.1061/(ASCE)ME.1943-5479.0000917
    Publisher: ASCE
    Abstract: Modular construction has been documented to be superior over traditional construction methods in terms of schedule, quality, predictability, and other project objectives. However, the lack of understanding and proper management of unique modular risks have been documented to result in suboptimal performance in modular construction projects. Although many previous research efforts have focused on the barriers and drivers related to the adoption of modular construction in the industry, no previous research work has addressed the key risks impacting cost and schedule of modular construction projects. This paper fills this knowledge gap. The authors utilized a multistep research methodology. First, a survey was distributed to and answered by 48 construction professionals to examine the effects of 50 modular risk factors that were identified based on a systematic literature review in a previous study. Second, a Cronbach’s alpha test was conducted to check survey validity and reliability. Finally, Kendall’s concordance analysis, one-way ANOVA, and Kruskal–Wallis tests were conducted to examine the agreement of responses within each as well as among the various stakeholders of modular construction projects. Results showed that the most critical factors affecting both cost and schedule of modular projects are (1) shortage of skilled and experienced laborers, (2) late design changes, (3) poor site attributes and logistics, (4) unsuitability of design for modularization, (5) contractual risks and disputes, (6) lack of adequate collaboration and coordination, (7) challenges related to tolerances and interfaces, and (8) poor construction activity sequencing. This study adds to the body of knowledge by helping practitioners to better understand the key risk factors that should be considered to enhance the performance of their modular construction projects. The outcomes provide insight into the alignment of stakeholders on the different risk factors affecting cost and schedule in modular construction projects. This should help practitioners to establish mitigation plans during the early stages of a project.
    • Download: (821.7Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Understanding the Key Risks Affecting Cost and Schedule Performance of Modular Construction Projects

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4269845
    Collections
    • Journal of Management in Engineering

    Show full item record

    contributor authorMohamad Abdul Nabi
    contributor authorIslam H. El-adaway
    date accessioned2022-01-31T23:30:32Z
    date available2022-01-31T23:30:32Z
    date issued7/1/2021
    identifier other%28ASCE%29ME.1943-5479.0000917.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4269845
    description abstractModular construction has been documented to be superior over traditional construction methods in terms of schedule, quality, predictability, and other project objectives. However, the lack of understanding and proper management of unique modular risks have been documented to result in suboptimal performance in modular construction projects. Although many previous research efforts have focused on the barriers and drivers related to the adoption of modular construction in the industry, no previous research work has addressed the key risks impacting cost and schedule of modular construction projects. This paper fills this knowledge gap. The authors utilized a multistep research methodology. First, a survey was distributed to and answered by 48 construction professionals to examine the effects of 50 modular risk factors that were identified based on a systematic literature review in a previous study. Second, a Cronbach’s alpha test was conducted to check survey validity and reliability. Finally, Kendall’s concordance analysis, one-way ANOVA, and Kruskal–Wallis tests were conducted to examine the agreement of responses within each as well as among the various stakeholders of modular construction projects. Results showed that the most critical factors affecting both cost and schedule of modular projects are (1) shortage of skilled and experienced laborers, (2) late design changes, (3) poor site attributes and logistics, (4) unsuitability of design for modularization, (5) contractual risks and disputes, (6) lack of adequate collaboration and coordination, (7) challenges related to tolerances and interfaces, and (8) poor construction activity sequencing. This study adds to the body of knowledge by helping practitioners to better understand the key risk factors that should be considered to enhance the performance of their modular construction projects. The outcomes provide insight into the alignment of stakeholders on the different risk factors affecting cost and schedule in modular construction projects. This should help practitioners to establish mitigation plans during the early stages of a project.
    publisherASCE
    titleUnderstanding the Key Risks Affecting Cost and Schedule Performance of Modular Construction Projects
    typeJournal Paper
    journal volume37
    journal issue4
    journal titleJournal of Management in Engineering
    identifier doi10.1061/(ASCE)ME.1943-5479.0000917
    journal fristpage04021023-1
    journal lastpage04021023-14
    page14
    treeJournal of Management in Engineering:;2021:;Volume ( 037 ):;issue: 004
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian