YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Management in Engineering
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Management in Engineering
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Schedule Delay Leading Indicators in Precast Concrete Construction Projects: Qualitative Comparative Analysis of Korean Cases

    Source: Journal of Management in Engineering:;2021:;Volume ( 037 ):;issue: 004::page 04021024-1
    Author:
    Kyeongwoon Cho
    ,
    Seungjun Ahn
    ,
    Kyungmo Park
    ,
    Tae Wan Kim
    DOI: 10.1061/(ASCE)ME.1943-5479.0000915
    Publisher: ASCE
    Abstract: This paper analyzed 19 precast concrete (PC) construction project cases from Korea using fuzzy-set qualitative comparative analysis to explore the relationship between the conditions of PC projects, observable at an early stage of the projects, and actual schedule delays. The following combinations of PC project conditions leading to schedule delays were identified: (1) the use of multiple types of PC components and nonuse of building information modeling (BIM) for schedule management; (2) PC construction included in the critical path, insufficient experience of the contractor in PC projects, and nonuse of BIM for schedule management; and (3) nonresidential building project, insufficient experience of the contractor in PC projects, and non-use of BIM for schedule management. To understand these findings more deeply, this research further investigated the relationships of the use of BIM with other schedule delay factors based on focus groups. The PC project schedule delay leading indicators identified in this research can help construction managers to mitigate schedule delay risks at an early stage in PC projects.
    • Download: (201.9Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Schedule Delay Leading Indicators in Precast Concrete Construction Projects: Qualitative Comparative Analysis of Korean Cases

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4269843
    Collections
    • Journal of Management in Engineering

    Show full item record

    contributor authorKyeongwoon Cho
    contributor authorSeungjun Ahn
    contributor authorKyungmo Park
    contributor authorTae Wan Kim
    date accessioned2022-01-31T23:30:27Z
    date available2022-01-31T23:30:27Z
    date issued7/1/2021
    identifier other%28ASCE%29ME.1943-5479.0000915.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4269843
    description abstractThis paper analyzed 19 precast concrete (PC) construction project cases from Korea using fuzzy-set qualitative comparative analysis to explore the relationship between the conditions of PC projects, observable at an early stage of the projects, and actual schedule delays. The following combinations of PC project conditions leading to schedule delays were identified: (1) the use of multiple types of PC components and nonuse of building information modeling (BIM) for schedule management; (2) PC construction included in the critical path, insufficient experience of the contractor in PC projects, and nonuse of BIM for schedule management; and (3) nonresidential building project, insufficient experience of the contractor in PC projects, and non-use of BIM for schedule management. To understand these findings more deeply, this research further investigated the relationships of the use of BIM with other schedule delay factors based on focus groups. The PC project schedule delay leading indicators identified in this research can help construction managers to mitigate schedule delay risks at an early stage in PC projects.
    publisherASCE
    titleSchedule Delay Leading Indicators in Precast Concrete Construction Projects: Qualitative Comparative Analysis of Korean Cases
    typeJournal Paper
    journal volume37
    journal issue4
    journal titleJournal of Management in Engineering
    identifier doi10.1061/(ASCE)ME.1943-5479.0000915
    journal fristpage04021024-1
    journal lastpage04021024-10
    page10
    treeJournal of Management in Engineering:;2021:;Volume ( 037 ):;issue: 004
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian