YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Management in Engineering
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Management in Engineering
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Predicting Budgetary Estimate of Highway Construction Projects in China Based on GRA-LASSO

    Source: Journal of Management in Engineering:;2021:;Volume ( 037 ):;issue: 003::page 04021012-1
    Author:
    Bin Tong
    ,
    Jingjuan Guo
    ,
    Shen Fang
    DOI: 10.1061/(ASCE)ME.1943-5479.0000890
    Publisher: ASCE
    Abstract: Under the development strategy of traffic power, Chinese highway engineering has been in the critical stage, and controlling investment has become a top priority. The budgetary estimate is the main basis for the Chinese government to verify the highway project investment, which is estimated mainly based on the quota and price information issued by government but still lacks systematic cost indices to measure its rationality. The highway engineering cost of different regions in China varies greatly, and the accumulated cost data are not insufficient. This paper chooses the gray relation analysis-least absolute shrinkage and selection operator (GRA-LASSO) hybrid method, which has significant advantages in dealing with high-dimensional small sample data and multiple correlation variables, to establish the highway engineering budgetary estimate prediction model so as to examine the rationality of estimated investment at the initial stage of construction. Using budgetary estimate data on 121 highway projects that have been approved by the Chinese government and various macroeconomic data, the key cost drivers are identified through gray relation analysis (GRA) quantitatively, and 10 high-correlation indexes are selected as input variables. Then, the relationship among engineering characteristic variables, economic factors, and highway engineering budget are established by least absolute shrinkage and selection operator (LASSO) regression. The empirical test results show that eight indexes have significant impact on the highway cost, including earthwork quantities, route length, number of lanes, bridge-tunnel ratio, protection works quantities, highway construction investment, producer price index (PPI) and purchasing manager’s index (PMI) of construction industry. Compared with ordinary least-squares (OLS) regression and LASSO method alone, the GRA-LASSO combined method has better performance in error evaluation index and stronger model accuracy and generalization ability. The study result can be mainly used for government to rapidly audit, forecast, forewarn, monitor, and manage the highway engineering cost, and also help investors and designers to pay close attention to the influence of design parameters and external environment on cost. Moreover, it provides a reference method or model for establishing a highway engineering cost index.
    • Download: (920.6Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Predicting Budgetary Estimate of Highway Construction Projects in China Based on GRA-LASSO

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4269817
    Collections
    • Journal of Management in Engineering

    Show full item record

    contributor authorBin Tong
    contributor authorJingjuan Guo
    contributor authorShen Fang
    date accessioned2022-01-31T23:29:31Z
    date available2022-01-31T23:29:31Z
    date issued5/1/2021
    identifier other%28ASCE%29ME.1943-5479.0000890.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4269817
    description abstractUnder the development strategy of traffic power, Chinese highway engineering has been in the critical stage, and controlling investment has become a top priority. The budgetary estimate is the main basis for the Chinese government to verify the highway project investment, which is estimated mainly based on the quota and price information issued by government but still lacks systematic cost indices to measure its rationality. The highway engineering cost of different regions in China varies greatly, and the accumulated cost data are not insufficient. This paper chooses the gray relation analysis-least absolute shrinkage and selection operator (GRA-LASSO) hybrid method, which has significant advantages in dealing with high-dimensional small sample data and multiple correlation variables, to establish the highway engineering budgetary estimate prediction model so as to examine the rationality of estimated investment at the initial stage of construction. Using budgetary estimate data on 121 highway projects that have been approved by the Chinese government and various macroeconomic data, the key cost drivers are identified through gray relation analysis (GRA) quantitatively, and 10 high-correlation indexes are selected as input variables. Then, the relationship among engineering characteristic variables, economic factors, and highway engineering budget are established by least absolute shrinkage and selection operator (LASSO) regression. The empirical test results show that eight indexes have significant impact on the highway cost, including earthwork quantities, route length, number of lanes, bridge-tunnel ratio, protection works quantities, highway construction investment, producer price index (PPI) and purchasing manager’s index (PMI) of construction industry. Compared with ordinary least-squares (OLS) regression and LASSO method alone, the GRA-LASSO combined method has better performance in error evaluation index and stronger model accuracy and generalization ability. The study result can be mainly used for government to rapidly audit, forecast, forewarn, monitor, and manage the highway engineering cost, and also help investors and designers to pay close attention to the influence of design parameters and external environment on cost. Moreover, it provides a reference method or model for establishing a highway engineering cost index.
    publisherASCE
    titlePredicting Budgetary Estimate of Highway Construction Projects in China Based on GRA-LASSO
    typeJournal Paper
    journal volume37
    journal issue3
    journal titleJournal of Management in Engineering
    identifier doi10.1061/(ASCE)ME.1943-5479.0000890
    journal fristpage04021012-1
    journal lastpage04021012-10
    page10
    treeJournal of Management in Engineering:;2021:;Volume ( 037 ):;issue: 003
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian