YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Exploring a Progressive Design-Build Best-Value Delivery Method in Highway Construction

    Source: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction:;2021:;Volume ( 013 ):;issue: 001::page 05020018-1
    Author:
    Douglas Alleman
    ,
    Dan Tran
    DOI: 10.1061/(ASCE)LA.1943-4170.0000443
    Publisher: ASCE
    Abstract: Progressive design-build (PDB) is being successfully executed in water and wastewater and airport construction projects. Building on the success in these sectors, highway agencies are judiciously utilizing PDB on a case-by-case basis. Existing best practices suggest qualifications-based selection (QBS) to be the only workable solution, limiting PDB’s use to the five agencies that support PDB with a QBS (PDB/QBS) procurement. Alternatively, 32 states allow for PDB with best-value (PDB/BV) procurement. To broaden PDB’s use, this study presents a detailed case study of the successful execution of PDB/BV Maryland’s $100 million Interstate 270 Innovative Congestion Management (I-270) project. The authors collected pertinent preconstruction documentation and interviewed the I-270 team leaders, including agency representatives, independent estimators, and contractor and designer representatives. In comparing the I-270 PDB/BV process with cited PDB/QBS benefits and challenges, this paper finds that PDB/BV (1) has greater contractor buy-in and collaboration and (2) maximizes project value for money, but (3) requires a more significant proposal development, and (4) potentially reduces innovation and flexibility. The findings from this study may help agencies better understand PDB/BV, increasing the quantity and quality of PDB use nationwide. With PDB being in its infancy in the transportation sector, any ineffective or inadequate execution of PDB may have national ramifications in the form of agencies’ hesitation to use it.
    • Download: (1.450Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Exploring a Progressive Design-Build Best-Value Delivery Method in Highway Construction

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4269767
    Collections
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction

    Show full item record

    contributor authorDouglas Alleman
    contributor authorDan Tran
    date accessioned2022-01-31T23:27:53Z
    date available2022-01-31T23:27:53Z
    date issued2/1/2021
    identifier other%28ASCE%29LA.1943-4170.0000443.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4269767
    description abstractProgressive design-build (PDB) is being successfully executed in water and wastewater and airport construction projects. Building on the success in these sectors, highway agencies are judiciously utilizing PDB on a case-by-case basis. Existing best practices suggest qualifications-based selection (QBS) to be the only workable solution, limiting PDB’s use to the five agencies that support PDB with a QBS (PDB/QBS) procurement. Alternatively, 32 states allow for PDB with best-value (PDB/BV) procurement. To broaden PDB’s use, this study presents a detailed case study of the successful execution of PDB/BV Maryland’s $100 million Interstate 270 Innovative Congestion Management (I-270) project. The authors collected pertinent preconstruction documentation and interviewed the I-270 team leaders, including agency representatives, independent estimators, and contractor and designer representatives. In comparing the I-270 PDB/BV process with cited PDB/QBS benefits and challenges, this paper finds that PDB/BV (1) has greater contractor buy-in and collaboration and (2) maximizes project value for money, but (3) requires a more significant proposal development, and (4) potentially reduces innovation and flexibility. The findings from this study may help agencies better understand PDB/BV, increasing the quantity and quality of PDB use nationwide. With PDB being in its infancy in the transportation sector, any ineffective or inadequate execution of PDB may have national ramifications in the form of agencies’ hesitation to use it.
    publisherASCE
    titleExploring a Progressive Design-Build Best-Value Delivery Method in Highway Construction
    typeJournal Paper
    journal volume13
    journal issue1
    journal titleJournal of Legal Affairs and Dispute Resolution in Engineering and Construction
    identifier doi10.1061/(ASCE)LA.1943-4170.0000443
    journal fristpage05020018-1
    journal lastpage05020018-14
    page14
    treeJournal of Legal Affairs and Dispute Resolution in Engineering and Construction:;2021:;Volume ( 013 ):;issue: 001
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian