YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Resource-Constrained Project Scheduling Problem under Multiple Time Constraints

    Source: Journal of Construction Engineering and Management:;2021:;Volume ( 147 ):;issue: 002::page 04020170
    Author:
    Feng Kong
    ,
    Dong Dou
    DOI: 10.1061/(ASCE)CO.1943-7862.0001990
    Publisher: ASCE
    Abstract: This paper introduces a new practical scheduling problem called the resource-constrained project scheduling problem under multiple time constraints, which involves a duration constraint of activity, temporal constraint, and resource calendar constraint. The duration constraint of the activity exists widely in real-life projects, and it is first proposed as a resource-constrained project scheduling problem in this paper. We prove the defects of the traditional temporal constraint and improve it. The new problem combines three types of time constraints for the first time, which makes it closer to the actual scheduling problem. We developed a constraint programming optimization model for the new problem and used the IBM ILOG CPLEX-CP version 12.9.0 optimizer to solve it. Computational experiments are carried out to show that the CP optimizer is fast and provides a near-optimum solution to the new problem for projects with hundreds of activities within minutes compared to other metaheuristic methods. The results reported in this paper can be used as a benchmark for other researchers to compare and improve. The new problem contributes to developing a practical decision support system for resolving real-life constraints in projects.
    • Download: (1.436Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Resource-Constrained Project Scheduling Problem under Multiple Time Constraints

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4269705
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorFeng Kong
    contributor authorDong Dou
    date accessioned2022-01-30T22:49:57Z
    date available2022-01-30T22:49:57Z
    date issued2/1/2021
    identifier other(ASCE)CO.1943-7862.0001990.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4269705
    description abstractThis paper introduces a new practical scheduling problem called the resource-constrained project scheduling problem under multiple time constraints, which involves a duration constraint of activity, temporal constraint, and resource calendar constraint. The duration constraint of the activity exists widely in real-life projects, and it is first proposed as a resource-constrained project scheduling problem in this paper. We prove the defects of the traditional temporal constraint and improve it. The new problem combines three types of time constraints for the first time, which makes it closer to the actual scheduling problem. We developed a constraint programming optimization model for the new problem and used the IBM ILOG CPLEX-CP version 12.9.0 optimizer to solve it. Computational experiments are carried out to show that the CP optimizer is fast and provides a near-optimum solution to the new problem for projects with hundreds of activities within minutes compared to other metaheuristic methods. The results reported in this paper can be used as a benchmark for other researchers to compare and improve. The new problem contributes to developing a practical decision support system for resolving real-life constraints in projects.
    publisherASCE
    titleResource-Constrained Project Scheduling Problem under Multiple Time Constraints
    typeJournal Paper
    journal volume147
    journal issue2
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)CO.1943-7862.0001990
    journal fristpage04020170
    journal lastpage04020170-13
    page13
    treeJournal of Construction Engineering and Management:;2021:;Volume ( 147 ):;issue: 002
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian