YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Surveying Engineering
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Surveying Engineering
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    New Computer Simulation Method for First-Order Design of Geodetic Network: Aiming for Low Cost

    Source: Journal of Surveying Engineering:;2021:;Volume ( 147 ):;issue: 001::page 04020020
    Author:
    Paweł Postek
    DOI: 10.1061/(ASCE)SU.1943-5428.0000334
    Publisher: ASCE
    Abstract: Optimization of a geodetic network is a process in which a specific stage (or stages) is designed in such a way that the obtained result meets the assumed (optimum) design requirements. The goal of this article is to present a new method for designing observation plans first-order design (FOD) that aims at maximally reducing the number of observations (the cost criterion) while maintaining the a priori established quality criteria (accuracy and reliability). To achieve this goal, a categorization of points was introduced and the criteria were arranged into a hierarchy. Because the method uses computer simulation, sequential estimation was also used to speed up the computational process. The cost model is a general model defined as minimization of the number of observations in the network, regardless of their weight. The study was carried out using the example of a geodetic network designed for the National Stadium in Warsaw. The results bear out the effectiveness of reduction of observations and show the impact that strict criteria have on the scale of this reduction.
    • Download: (2.305Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      New Computer Simulation Method for First-Order Design of Geodetic Network: Aiming for Low Cost

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4269591
    Collections
    • Journal of Surveying Engineering

    Show full item record

    contributor authorPaweł Postek
    date accessioned2022-01-30T22:46:55Z
    date available2022-01-30T22:46:55Z
    date issued2/1/2021
    identifier other(ASCE)SU.1943-5428.0000334.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4269591
    description abstractOptimization of a geodetic network is a process in which a specific stage (or stages) is designed in such a way that the obtained result meets the assumed (optimum) design requirements. The goal of this article is to present a new method for designing observation plans first-order design (FOD) that aims at maximally reducing the number of observations (the cost criterion) while maintaining the a priori established quality criteria (accuracy and reliability). To achieve this goal, a categorization of points was introduced and the criteria were arranged into a hierarchy. Because the method uses computer simulation, sequential estimation was also used to speed up the computational process. The cost model is a general model defined as minimization of the number of observations in the network, regardless of their weight. The study was carried out using the example of a geodetic network designed for the National Stadium in Warsaw. The results bear out the effectiveness of reduction of observations and show the impact that strict criteria have on the scale of this reduction.
    publisherASCE
    titleNew Computer Simulation Method for First-Order Design of Geodetic Network: Aiming for Low Cost
    typeJournal Paper
    journal volume147
    journal issue1
    journal titleJournal of Surveying Engineering
    identifier doi10.1061/(ASCE)SU.1943-5428.0000334
    journal fristpage04020020
    journal lastpage04020020-10
    page10
    treeJournal of Surveying Engineering:;2021:;Volume ( 147 ):;issue: 001
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian