YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Management in Engineering
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Management in Engineering
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Impact of Dynamic Workforce and Workplace Variables on the Productivity of the Construction Industry: New Gross Construction Productivity Indicator

    Source: Journal of Management in Engineering:;2021:;Volume ( 037 ):;issue: 001::page 04020092
    Author:
    Rayan Assaad
    ,
    Islam H. El-adaway
    DOI: 10.1061/(ASCE)ME.1943-5479.0000862
    Publisher: ASCE
    Abstract: Construction productivity is the industry’s predominant determinant of performance. Although the construction industry periodically provides large amount of data, existing studies have not fully exploited such data sets, especially relating to the overall productivity of the construction industry rather than labor productivity. This paper addresses this critical knowledge gap by statistically examining and modeling the causalities between different dynamic workforce and workplace variables and the productivity of the entire construction industry. Multivariate time-series data between 2006 and 2019 were collected for the productivity of the construction industry and 11 dynamic workforce and workplace variables: job openings, job hires, turnover or job separations, total compensation, gross job gains, gross job losses, average hourly earnings, fatalities, occupational injuries and illnesses, gross domestic product, and unemployment rate. Statistically significant relationships and causalities were examined between the response variable—productivity of the construction industry—and these 11 variables. A vector autoregression (VAR) framework was developed to model the temporal variations in the productivity of the construction industry. The developed VAR model was validated by predicting the construction productivity for the 2016–2019 period an acceptable mean average percentage error of 5.13%. Based on the findings, the paper concludes that (1) all considered dynamic workforce and workplace variables, except job openings, statistically cause fluctuations in the construction productivity; (2) the new concept of gross construction productivity is justified statistically and should be implemented in the construction industry; (3) the gross construction productivity is an additional valuable information that construction companies should consider to make different insightful and well-educated industry-related decisions; (4) the health of the construction industry needs to be studied based on the productivity of the industry as a whole rather than based on labor productivity alone; and (5) the construction industry should move toward the development of a notion of gross construction productivity indicator used to measure, evaluate, and predict the performance of the entire industry. Ultimately, this paper proposes a new indicator or index for gross construction productivity. The outcomes of this paper add to the body of knowledge by providing a better understanding of the impact of different dynamic workforce and workplace variables on the construction productivity and by offering a new concept called gross construction productivity.
    • Download: (1.530Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Impact of Dynamic Workforce and Workplace Variables on the Productivity of the Construction Industry: New Gross Construction Productivity Indicator

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4269374
    Collections
    • Journal of Management in Engineering

    Show full item record

    contributor authorRayan Assaad
    contributor authorIslam H. El-adaway
    date accessioned2022-01-30T22:39:52Z
    date available2022-01-30T22:39:52Z
    date issued1/1/2021
    identifier other(ASCE)ME.1943-5479.0000862.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4269374
    description abstractConstruction productivity is the industry’s predominant determinant of performance. Although the construction industry periodically provides large amount of data, existing studies have not fully exploited such data sets, especially relating to the overall productivity of the construction industry rather than labor productivity. This paper addresses this critical knowledge gap by statistically examining and modeling the causalities between different dynamic workforce and workplace variables and the productivity of the entire construction industry. Multivariate time-series data between 2006 and 2019 were collected for the productivity of the construction industry and 11 dynamic workforce and workplace variables: job openings, job hires, turnover or job separations, total compensation, gross job gains, gross job losses, average hourly earnings, fatalities, occupational injuries and illnesses, gross domestic product, and unemployment rate. Statistically significant relationships and causalities were examined between the response variable—productivity of the construction industry—and these 11 variables. A vector autoregression (VAR) framework was developed to model the temporal variations in the productivity of the construction industry. The developed VAR model was validated by predicting the construction productivity for the 2016–2019 period an acceptable mean average percentage error of 5.13%. Based on the findings, the paper concludes that (1) all considered dynamic workforce and workplace variables, except job openings, statistically cause fluctuations in the construction productivity; (2) the new concept of gross construction productivity is justified statistically and should be implemented in the construction industry; (3) the gross construction productivity is an additional valuable information that construction companies should consider to make different insightful and well-educated industry-related decisions; (4) the health of the construction industry needs to be studied based on the productivity of the industry as a whole rather than based on labor productivity alone; and (5) the construction industry should move toward the development of a notion of gross construction productivity indicator used to measure, evaluate, and predict the performance of the entire industry. Ultimately, this paper proposes a new indicator or index for gross construction productivity. The outcomes of this paper add to the body of knowledge by providing a better understanding of the impact of different dynamic workforce and workplace variables on the construction productivity and by offering a new concept called gross construction productivity.
    publisherASCE
    titleImpact of Dynamic Workforce and Workplace Variables on the Productivity of the Construction Industry: New Gross Construction Productivity Indicator
    typeJournal Paper
    journal volume37
    journal issue1
    journal titleJournal of Management in Engineering
    identifier doi10.1061/(ASCE)ME.1943-5479.0000862
    journal fristpage04020092
    journal lastpage04020092-15
    page15
    treeJournal of Management in Engineering:;2021:;Volume ( 037 ):;issue: 001
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian