YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    RCPSP with Combined Precedence Relations and Resource Calendars

    Source: Journal of Construction Engineering and Management:;2020:;Volume ( 146 ):;issue: 012
    Author:
    Feng Kong
    ,
    Dong Dou
    DOI: 10.1061/(ASCE)CO.1943-7862.0001929
    Publisher: ASCE
    Abstract: This research introduces a new scheduling problem called the resource-constrained project scheduling problem with combined precedence relations and resource calendars (RCPSP/CPRs-cal). Combined precedence relations (CPRs) extend generalized precedence relations (GPRs) and can effectively represent all possible combinations of precedence relations between activities. Resource calendars reflect resource time constraints that are closer to real-life project scheduling. A new network diagram was designed for RCPSP/CPRs-cal; it uses nodes to unify activities and precedence relations. It solves a problem in which traditional networks are prone to form cycles when representing combined precedence relations. An extended genetic algorithm (GA-NND) is proposed for solving RCPSP/CPRs-cal efficiently; it uses the new network diagram for coding to generate the node scheduling scheme. A three-step guideline and an example are provided for schedulers in order to help them better use GA-NND to solve RCPSP/CPRs-cal. Computational experiments were carried out to show that the extended genetic algorithm can solve RCPSP/CPRs-cal more quickly and accurately than the traditional genetic algorithm. The new problem contributes to developing a practical decision support system for resolving real-life constraints in projects.
    • Download: (891.6Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      RCPSP with Combined Precedence Relations and Resource Calendars

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4268341
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorFeng Kong
    contributor authorDong Dou
    date accessioned2022-01-30T21:31:00Z
    date available2022-01-30T21:31:00Z
    date issued12/1/2020 12:00:00 AM
    identifier other%28ASCE%29CO.1943-7862.0001929.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4268341
    description abstractThis research introduces a new scheduling problem called the resource-constrained project scheduling problem with combined precedence relations and resource calendars (RCPSP/CPRs-cal). Combined precedence relations (CPRs) extend generalized precedence relations (GPRs) and can effectively represent all possible combinations of precedence relations between activities. Resource calendars reflect resource time constraints that are closer to real-life project scheduling. A new network diagram was designed for RCPSP/CPRs-cal; it uses nodes to unify activities and precedence relations. It solves a problem in which traditional networks are prone to form cycles when representing combined precedence relations. An extended genetic algorithm (GA-NND) is proposed for solving RCPSP/CPRs-cal efficiently; it uses the new network diagram for coding to generate the node scheduling scheme. A three-step guideline and an example are provided for schedulers in order to help them better use GA-NND to solve RCPSP/CPRs-cal. Computational experiments were carried out to show that the extended genetic algorithm can solve RCPSP/CPRs-cal more quickly and accurately than the traditional genetic algorithm. The new problem contributes to developing a practical decision support system for resolving real-life constraints in projects.
    publisherASCE
    titleRCPSP with Combined Precedence Relations and Resource Calendars
    typeJournal Paper
    journal volume146
    journal issue12
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)CO.1943-7862.0001929
    page15
    treeJournal of Construction Engineering and Management:;2020:;Volume ( 146 ):;issue: 012
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian