YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Examining the Effect of Material Management Issues on the Schedule and Cost Performance of Construction Projects Based on a Structural Equation Model: Survey of Indian Experiences

    Source: Journal of Construction Engineering and Management:;2020:;Volume ( 146 ):;issue: 009
    Author:
    Santu Kar
    ,
    Kumar Neeraj Jha
    DOI: 10.1061/(ASCE)CO.1943-7862.0001906
    Publisher: ASCE
    Abstract: An effective material management system is key to the success of construction projects. However, the Indian construction industry suffers from many material management issues that lead to ineffectiveness in the material management system. Previous studies in the field have not comprehensively examined the issues affecting the schedule and cost performance of construction projects. To address this gap, this study identified a total of 33 material management issues from the existing literature and conducted interviews with 15 material management experts with more than 10  years of experience in material management. The data were collected through the use of a questionnaire survey completed by 86 procurement professionals. The results revealed six factors with a significant positive influence on the disruption of projects’ schedule and cost performances. Improper delivery of materials is the most critical material management factor, followed by inadequate planning of materials, lack of information and communication, financial issues in procurement, changes in scope of materials, and difficulty in transportation. The findings of this study enable construction practitioners to effectively focus on the few critical factors to improve the material management system and thereby enhancing projects’ schedule and cost performances.
    • Download: (306.4Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Examining the Effect of Material Management Issues on the Schedule and Cost Performance of Construction Projects Based on a Structural Equation Model: Survey of Indian Experiences

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4268319
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorSantu Kar
    contributor authorKumar Neeraj Jha
    date accessioned2022-01-30T21:30:06Z
    date available2022-01-30T21:30:06Z
    date issued9/1/2020 12:00:00 AM
    identifier other%28ASCE%29CO.1943-7862.0001906.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4268319
    description abstractAn effective material management system is key to the success of construction projects. However, the Indian construction industry suffers from many material management issues that lead to ineffectiveness in the material management system. Previous studies in the field have not comprehensively examined the issues affecting the schedule and cost performance of construction projects. To address this gap, this study identified a total of 33 material management issues from the existing literature and conducted interviews with 15 material management experts with more than 10  years of experience in material management. The data were collected through the use of a questionnaire survey completed by 86 procurement professionals. The results revealed six factors with a significant positive influence on the disruption of projects’ schedule and cost performances. Improper delivery of materials is the most critical material management factor, followed by inadequate planning of materials, lack of information and communication, financial issues in procurement, changes in scope of materials, and difficulty in transportation. The findings of this study enable construction practitioners to effectively focus on the few critical factors to improve the material management system and thereby enhancing projects’ schedule and cost performances.
    publisherASCE
    titleExamining the Effect of Material Management Issues on the Schedule and Cost Performance of Construction Projects Based on a Structural Equation Model: Survey of Indian Experiences
    typeJournal Paper
    journal volume146
    journal issue9
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)CO.1943-7862.0001906
    page12
    treeJournal of Construction Engineering and Management:;2020:;Volume ( 146 ):;issue: 009
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian