YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Forecasting Accuracy of In-Progress Activity Duration and Cost Estimates

    Source: Journal of Construction Engineering and Management:;2020:;Volume ( 146 ):;issue: 009
    Author:
    Pablo Ballesteros-Pérez
    ,
    Enoc Sanz-Ablanedo
    ,
    Alberto Cerezo-Narváez
    ,
    Gunnar Lucko
    ,
    Andrés Pastor-Fernández
    ,
    Manuel Otero-Mateo
    ,
    Juan Pablo Contreras-Samper
    DOI: 10.1061/(ASCE)CO.1943-7862.0001900
    Publisher: ASCE
    Abstract: When a project activity has already started, tracking information such as percentage complete and current activity duration and cost can be easily retrieved. This information can be used to update the project schedule to anticipate the eventual project duration and cost more precisely. But hardly any studies analyzed how more accurate or reliable activity tracking information can be compared with the initial (planned) estimates, let alone which mathematical forecasting expressions are the most accurate. This paper quantified forecasting accuracy by extracting over 3,000 activities with partial tracking information (i.e., those which have already started but are not yet complete) from a real project data set. Two expressions for forecasting the activity duration and cost were tested by comparing their performance with initial (planned) and final (actual) values. The contributions to the body of knowledge are fourfold. First, it was shown that activity tracking information considerably outperforms planned estimates. Second, using two expressions can significantly minimize the deviations of time and cost estimates. Third, remaining activities’ duration and cost estimates can be closely modeled with log-normal distributions as a function of the activities’ percentage complete. Fourth, variability decreases linearly as activities approach their end. These findings allow project managers to better anticipate and model the duration and cost variability of ongoing activities and to improve the forecasting accuracy of the project duration and cost estimates.
    • Download: (1.308Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Forecasting Accuracy of In-Progress Activity Duration and Cost Estimates

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4268313
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorPablo Ballesteros-Pérez
    contributor authorEnoc Sanz-Ablanedo
    contributor authorAlberto Cerezo-Narváez
    contributor authorGunnar Lucko
    contributor authorAndrés Pastor-Fernández
    contributor authorManuel Otero-Mateo
    contributor authorJuan Pablo Contreras-Samper
    date accessioned2022-01-30T21:29:54Z
    date available2022-01-30T21:29:54Z
    date issued9/1/2020 12:00:00 AM
    identifier other%28ASCE%29CO.1943-7862.0001900.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4268313
    description abstractWhen a project activity has already started, tracking information such as percentage complete and current activity duration and cost can be easily retrieved. This information can be used to update the project schedule to anticipate the eventual project duration and cost more precisely. But hardly any studies analyzed how more accurate or reliable activity tracking information can be compared with the initial (planned) estimates, let alone which mathematical forecasting expressions are the most accurate. This paper quantified forecasting accuracy by extracting over 3,000 activities with partial tracking information (i.e., those which have already started but are not yet complete) from a real project data set. Two expressions for forecasting the activity duration and cost were tested by comparing their performance with initial (planned) and final (actual) values. The contributions to the body of knowledge are fourfold. First, it was shown that activity tracking information considerably outperforms planned estimates. Second, using two expressions can significantly minimize the deviations of time and cost estimates. Third, remaining activities’ duration and cost estimates can be closely modeled with log-normal distributions as a function of the activities’ percentage complete. Fourth, variability decreases linearly as activities approach their end. These findings allow project managers to better anticipate and model the duration and cost variability of ongoing activities and to improve the forecasting accuracy of the project duration and cost estimates.
    publisherASCE
    titleForecasting Accuracy of In-Progress Activity Duration and Cost Estimates
    typeJournal Paper
    journal volume146
    journal issue9
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)CO.1943-7862.0001900
    page13
    treeJournal of Construction Engineering and Management:;2020:;Volume ( 146 ):;issue: 009
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian