YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Dynamic Network Analysis of Stakeholder Conflicts in Megaprojects: Sixteen-Year Case of Hong Kong-Zhuhai-Macao Bridge

    Source: Journal of Construction Engineering and Management:;2020:;Volume ( 146 ):;issue: 009
    Author:
    Jin Xue
    ,
    Geoffrey Qiping Shen
    ,
    Rebecca Jing Yang
    ,
    Irfan Zafar
    ,
    E. M. A. C. Ekanayake
    DOI: 10.1061/(ASCE)CO.1943-7862.0001895
    Publisher: ASCE
    Abstract: Stakeholder conflicts are hard to avoid in the implementation of megaprojects due to the diverse interests and aims among stakeholders. The previous study does not provide much evidence on dynamic patterns of stakeholder conflicts in the project duration from the planning to the construction and handover stage. Therefore, this study established a network-based framework to analyze the dynamics of stakeholder conflicts by detecting the critical conflicts and the affected relationships among stakeholders with a 16-year case study of the Hong Kong-Zhuhai-Macao Bridge project. Finally, a stakeholder-conflict map was proposed to provide management strategies considering the conflict criticalness and stakeholder participation of each stakeholder conflict. After reviewing 1,748 official documents from 2003 to 2018, the chronological features of environmental conflicts, neighboring conflicts, and traditional conflicts are detected. The changes of stakeholder relationships in the project duration are discussed by five stakeholder groups: local industry, green group, supervision group, construction group, and governmental organizations. The Mirror Z strategies of stakeholder conflicts are proposed in the phases of planning, construction, and handover, respectively.
    • Download: (1.603Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Dynamic Network Analysis of Stakeholder Conflicts in Megaprojects: Sixteen-Year Case of Hong Kong-Zhuhai-Macao Bridge

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4268307
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorJin Xue
    contributor authorGeoffrey Qiping Shen
    contributor authorRebecca Jing Yang
    contributor authorIrfan Zafar
    contributor authorE. M. A. C. Ekanayake
    date accessioned2022-01-30T21:29:40Z
    date available2022-01-30T21:29:40Z
    date issued9/1/2020 12:00:00 AM
    identifier other%28ASCE%29CO.1943-7862.0001895.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4268307
    description abstractStakeholder conflicts are hard to avoid in the implementation of megaprojects due to the diverse interests and aims among stakeholders. The previous study does not provide much evidence on dynamic patterns of stakeholder conflicts in the project duration from the planning to the construction and handover stage. Therefore, this study established a network-based framework to analyze the dynamics of stakeholder conflicts by detecting the critical conflicts and the affected relationships among stakeholders with a 16-year case study of the Hong Kong-Zhuhai-Macao Bridge project. Finally, a stakeholder-conflict map was proposed to provide management strategies considering the conflict criticalness and stakeholder participation of each stakeholder conflict. After reviewing 1,748 official documents from 2003 to 2018, the chronological features of environmental conflicts, neighboring conflicts, and traditional conflicts are detected. The changes of stakeholder relationships in the project duration are discussed by five stakeholder groups: local industry, green group, supervision group, construction group, and governmental organizations. The Mirror Z strategies of stakeholder conflicts are proposed in the phases of planning, construction, and handover, respectively.
    publisherASCE
    titleDynamic Network Analysis of Stakeholder Conflicts in Megaprojects: Sixteen-Year Case of Hong Kong-Zhuhai-Macao Bridge
    typeJournal Paper
    journal volume146
    journal issue9
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)CO.1943-7862.0001895
    page16
    treeJournal of Construction Engineering and Management:;2020:;Volume ( 146 ):;issue: 009
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian