YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Success DNA of a Record-Breaking Megaproject

    Source: Journal of Construction Engineering and Management:;2020:;Volume ( 146 ):;issue: 008
    Author:
    Liuying Zhu
    ,
    Sai On Cheung
    ,
    Xinglin Gao
    ,
    Qian Li
    ,
    Gang Liu
    DOI: 10.1061/(ASCE)CO.1943-7862.0001878
    Publisher: ASCE
    Abstract: After 8 years of construction, the Hong Kong–Zhuhai–Macao Bridge (HZMB) came into use in October 2018. The HZMB is currently the world’s longest oversea bridge. The HZMB is technically demanding for both the physical conditions and the stringent environmental protection measures. In addition, the involvement of three regional governments gave rise to complex coordination and communication issues. All these challenges called for supereffective project management. Notwithstanding, notable accomplishments were reported and more than 450 patents were obtained. For example, the rapid island formation technology used greatly shortened the construction period and saved cost. The project can be identified as a showcase of the latest oversea bridge construction technology. To unveil the success DNA of this record-breaking megaproject, an in-depth case study was conducted. While many reported case studies on the HZMB project have focused on the technical aspects, this case study takes a project management perspective. Through structured interviews, the HZMB project team members commented that the project reputation evaluation system (PRES) used in the project incentivized the contractors’ performance through building an interorganizational relationship (IOR). This observation is in line with the proposition advocated in the IOR literature—an enhanced relationship has a positive effect on project performance. The comment of the project team member is further supported by the analyses of 28 sets of quarterly PRES evaluation scores that are reflective of IOR determinants. This study concludes that: (1) the PRES is an instrumental project management tool, and (2) one of the functions of the PRES is building IOR. The theoretical framework and empirical evidence showcase exemplary project management. Accordingly, it is further recommended that for megaprojects: (1) monetary reward cannot be the singular performance motivator, (2) IOR maintenance should be one of the planning foci of incentivization, and (3) there is no substitute for seamless communication in project management.
    • Download: (1.240Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Success DNA of a Record-Breaking Megaproject

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4268289
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorLiuying Zhu
    contributor authorSai On Cheung
    contributor authorXinglin Gao
    contributor authorQian Li
    contributor authorGang Liu
    date accessioned2022-01-30T21:29:10Z
    date available2022-01-30T21:29:10Z
    date issued8/1/2020 12:00:00 AM
    identifier other%28ASCE%29CO.1943-7862.0001878.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4268289
    description abstractAfter 8 years of construction, the Hong Kong–Zhuhai–Macao Bridge (HZMB) came into use in October 2018. The HZMB is currently the world’s longest oversea bridge. The HZMB is technically demanding for both the physical conditions and the stringent environmental protection measures. In addition, the involvement of three regional governments gave rise to complex coordination and communication issues. All these challenges called for supereffective project management. Notwithstanding, notable accomplishments were reported and more than 450 patents were obtained. For example, the rapid island formation technology used greatly shortened the construction period and saved cost. The project can be identified as a showcase of the latest oversea bridge construction technology. To unveil the success DNA of this record-breaking megaproject, an in-depth case study was conducted. While many reported case studies on the HZMB project have focused on the technical aspects, this case study takes a project management perspective. Through structured interviews, the HZMB project team members commented that the project reputation evaluation system (PRES) used in the project incentivized the contractors’ performance through building an interorganizational relationship (IOR). This observation is in line with the proposition advocated in the IOR literature—an enhanced relationship has a positive effect on project performance. The comment of the project team member is further supported by the analyses of 28 sets of quarterly PRES evaluation scores that are reflective of IOR determinants. This study concludes that: (1) the PRES is an instrumental project management tool, and (2) one of the functions of the PRES is building IOR. The theoretical framework and empirical evidence showcase exemplary project management. Accordingly, it is further recommended that for megaprojects: (1) monetary reward cannot be the singular performance motivator, (2) IOR maintenance should be one of the planning foci of incentivization, and (3) there is no substitute for seamless communication in project management.
    publisherASCE
    titleSuccess DNA of a Record-Breaking Megaproject
    typeJournal Paper
    journal volume146
    journal issue8
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)CO.1943-7862.0001878
    page14
    treeJournal of Construction Engineering and Management:;2020:;Volume ( 146 ):;issue: 008
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian