YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Synchronized Optimization of Various Management-Function Schedules in a Multiproject Environment: Case Study of Planning Steel Girder Fabrication Projects in Bridge Construction

    Source: Journal of Construction Engineering and Management:;2020:;Volume ( 146 ):;issue: 005
    Author:
    Jing Liu
    ,
    Ming Lu
    DOI: 10.1061/(ASCE)CO.1943-7862.0001813
    Publisher: ASCE
    Abstract: Structural steel prefabrication is a generally accepted practice in the construction industry conducive to better control of project duration and cost, higher productivity and efficiency, and enhanced quality and safety performance. This study initiated with an investigation of the current practice of major structural steel fabricators in Alberta, where skilled trades rather than fully automated equipment remain the critical resources in production planning and scheduling. How to synchronize the schedules of concurrent projects at different levels to optimize the allocation of fabrication resources (particularly skilled laborers) is identified as a matter of pressing concern in the industry. In collaboration with an industry partner in Edmonton, Alberta, Canada, we (1) developed a unified work breakdown structure (WBS) based on project management functions such as bidding, production planning, estimating, and scheduling; (2) synchronized schedules for various management functions by implementing a dual-level multiproject optimization scheduling framework; and (3) developed a multiproject scheduling tool to implement the research in practice. A case study of the fabrication of steel girders for three bridges investigates the benefits of the proposed scheduling approach to the fabrication process, which include improved alignment between shop operation progress, individual project objectives, and overall program goals.
    • Download: (2.699Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Synchronized Optimization of Various Management-Function Schedules in a Multiproject Environment: Case Study of Planning Steel Girder Fabrication Projects in Bridge Construction

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4268270
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorJing Liu
    contributor authorMing Lu
    date accessioned2022-01-30T21:28:37Z
    date available2022-01-30T21:28:37Z
    date issued5/1/2020 12:00:00 AM
    identifier other%28ASCE%29CO.1943-7862.0001813.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4268270
    description abstractStructural steel prefabrication is a generally accepted practice in the construction industry conducive to better control of project duration and cost, higher productivity and efficiency, and enhanced quality and safety performance. This study initiated with an investigation of the current practice of major structural steel fabricators in Alberta, where skilled trades rather than fully automated equipment remain the critical resources in production planning and scheduling. How to synchronize the schedules of concurrent projects at different levels to optimize the allocation of fabrication resources (particularly skilled laborers) is identified as a matter of pressing concern in the industry. In collaboration with an industry partner in Edmonton, Alberta, Canada, we (1) developed a unified work breakdown structure (WBS) based on project management functions such as bidding, production planning, estimating, and scheduling; (2) synchronized schedules for various management functions by implementing a dual-level multiproject optimization scheduling framework; and (3) developed a multiproject scheduling tool to implement the research in practice. A case study of the fabrication of steel girders for three bridges investigates the benefits of the proposed scheduling approach to the fabrication process, which include improved alignment between shop operation progress, individual project objectives, and overall program goals.
    publisherASCE
    titleSynchronized Optimization of Various Management-Function Schedules in a Multiproject Environment: Case Study of Planning Steel Girder Fabrication Projects in Bridge Construction
    typeJournal Paper
    journal volume146
    journal issue5
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)CO.1943-7862.0001813
    page17
    treeJournal of Construction Engineering and Management:;2020:;Volume ( 146 ):;issue: 005
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian