YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Critical Strategies for Enhancing BIM Implementation in AEC Projects: Perspectives from Chinese Practitioners

    Source: Journal of Construction Engineering and Management:;2020:;Volume ( 146 ):;issue: 002
    Author:
    Xiaozhi Ma
    ,
    Albert P. C. Chan
    ,
    Yongkui Li
    ,
    Boyu Zhang
    ,
    Feng Xiong
    DOI: 10.1061/(ASCE)CO.1943-7862.0001748
    Publisher: ASCE
    Abstract: The production of the architecture engineering and construction (AEC) industry is organized by projects. With the diffusion of information and communication technology in the industry, building information modeling (BIM) is widely adopted in AEC projects. However, the systematic implementation of BIM in AEC projects experiences challenges. This study aims to identify critical strategies for enhancing BIM implementation within the AEC project context. Initially, 17 strategies are drawn from a comprehensive review of the relevant literature. Through a questionnaire survey with 116 effective responses from the practitioners, ten critical strategies are identified, with the top five being clearly defined plans and objectives for BIM implementation, financial support, capabilities and skills in BIM technology, availability and interoperability of engineering information and data, and the aligned objective of BIM implementation with the project goal. The study also investigates the possible discrepancy in the different actors’ assessments on the criticality of the strategies to validate the survey. The further principal component analysis groups the strategies and finds five latent factors of the strategies, including institutional governance, change accommodation, technical environment, cooperation, and resources. This finding reveals that systematic BIM implementation is inevitably associated with the AEC project context and indicates that the enhancement of current BIM implementation in projects covers the strategies of the technical, institutional, and managerial aspects to accommodate changes brought by BIM. An international comparison of the top drivers with the found peer studies from Nigeria, Singapore, and Turkey classifies leadership as a driving force to incorporate BIM into the AEC projects. The results provide implications for enhancing BIM implementation in AEC projects and may help improve the efficiency of the industry.
    • Download: (808.2Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Critical Strategies for Enhancing BIM Implementation in AEC Projects: Perspectives from Chinese Practitioners

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4268267
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorXiaozhi Ma
    contributor authorAlbert P. C. Chan
    contributor authorYongkui Li
    contributor authorBoyu Zhang
    contributor authorFeng Xiong
    date accessioned2022-01-30T21:28:32Z
    date available2022-01-30T21:28:32Z
    date issued2/1/2020 12:00:00 AM
    identifier other%28ASCE%29CO.1943-7862.0001748.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4268267
    description abstractThe production of the architecture engineering and construction (AEC) industry is organized by projects. With the diffusion of information and communication technology in the industry, building information modeling (BIM) is widely adopted in AEC projects. However, the systematic implementation of BIM in AEC projects experiences challenges. This study aims to identify critical strategies for enhancing BIM implementation within the AEC project context. Initially, 17 strategies are drawn from a comprehensive review of the relevant literature. Through a questionnaire survey with 116 effective responses from the practitioners, ten critical strategies are identified, with the top five being clearly defined plans and objectives for BIM implementation, financial support, capabilities and skills in BIM technology, availability and interoperability of engineering information and data, and the aligned objective of BIM implementation with the project goal. The study also investigates the possible discrepancy in the different actors’ assessments on the criticality of the strategies to validate the survey. The further principal component analysis groups the strategies and finds five latent factors of the strategies, including institutional governance, change accommodation, technical environment, cooperation, and resources. This finding reveals that systematic BIM implementation is inevitably associated with the AEC project context and indicates that the enhancement of current BIM implementation in projects covers the strategies of the technical, institutional, and managerial aspects to accommodate changes brought by BIM. An international comparison of the top drivers with the found peer studies from Nigeria, Singapore, and Turkey classifies leadership as a driving force to incorporate BIM into the AEC projects. The results provide implications for enhancing BIM implementation in AEC projects and may help improve the efficiency of the industry.
    publisherASCE
    titleCritical Strategies for Enhancing BIM Implementation in AEC Projects: Perspectives from Chinese Practitioners
    typeJournal Paper
    journal volume146
    journal issue2
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)CO.1943-7862.0001748
    page10
    treeJournal of Construction Engineering and Management:;2020:;Volume ( 146 ):;issue: 002
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian