YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Performance of Constructed Facilities
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Performance of Constructed Facilities
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Reliability-Based Maintenance Strategy for Gusset Plate Connections in Steel Bridges Based on Life-Cost Optimization

    Source: Journal of Performance of Constructed Facilities:;2020:;Volume ( 034 ):;issue: 005
    Author:
    Zhongxiang Liu
    ,
    Tong Guo
    ,
    José Correia
    ,
    Libin Wang
    DOI: 10.1061/(ASCE)CF.1943-5509.0001493
    Publisher: ASCE
    Abstract: This paper focuses on the maintenance decision of vulnerable parts that need rehabilitating within the design service period under repetitive vehicular loads in steel bridges based on the time-variant performance deterioration and life-cost optimization. A practical life-cost reliability-based method was developed to characterize the performance deterioration of critical parts without and with maintenance, and then evaluate maintenance strategies according to life-cost indicators. The time-variant reliability index was mathematically derived according to the damage accumulation rule and life-cost optimization was established to determine the optimal maintenance strategy using particle swarm optimization. The developed method was effectively applied in the optimization analysis of the tube–gusset connection. Four maintenance measures, including plug welding, drilling the crack-stop hole, the welding plate, and changing the bolted channel–gusset connection, were used in longitudinal truss diaphragms of the Second Nanjing Yangzi Bridge and analyzed in a single form and in combination, respectively. It is observed that a single maintenance cannot protect the tube–gusset connection from damage failure within the expected service life (i.e., 100 years) for the restriction on the maintenance frequency, while the combined maintenances with bolted channel–gusset connection do much better than those with welded plate in protecting the detail from damage failure. The optimization results can provide an important basis for maintenance and design, where the optimal maintenance is effectively addressed.
    • Download: (1.852Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Reliability-Based Maintenance Strategy for Gusset Plate Connections in Steel Bridges Based on Life-Cost Optimization

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4268225
    Collections
    • Journal of Performance of Constructed Facilities

    Show full item record

    contributor authorZhongxiang Liu
    contributor authorTong Guo
    contributor authorJosé Correia
    contributor authorLibin Wang
    date accessioned2022-01-30T21:27:14Z
    date available2022-01-30T21:27:14Z
    date issued10/1/2020 12:00:00 AM
    identifier other%28ASCE%29CF.1943-5509.0001493.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4268225
    description abstractThis paper focuses on the maintenance decision of vulnerable parts that need rehabilitating within the design service period under repetitive vehicular loads in steel bridges based on the time-variant performance deterioration and life-cost optimization. A practical life-cost reliability-based method was developed to characterize the performance deterioration of critical parts without and with maintenance, and then evaluate maintenance strategies according to life-cost indicators. The time-variant reliability index was mathematically derived according to the damage accumulation rule and life-cost optimization was established to determine the optimal maintenance strategy using particle swarm optimization. The developed method was effectively applied in the optimization analysis of the tube–gusset connection. Four maintenance measures, including plug welding, drilling the crack-stop hole, the welding plate, and changing the bolted channel–gusset connection, were used in longitudinal truss diaphragms of the Second Nanjing Yangzi Bridge and analyzed in a single form and in combination, respectively. It is observed that a single maintenance cannot protect the tube–gusset connection from damage failure within the expected service life (i.e., 100 years) for the restriction on the maintenance frequency, while the combined maintenances with bolted channel–gusset connection do much better than those with welded plate in protecting the detail from damage failure. The optimization results can provide an important basis for maintenance and design, where the optimal maintenance is effectively addressed.
    publisherASCE
    titleReliability-Based Maintenance Strategy for Gusset Plate Connections in Steel Bridges Based on Life-Cost Optimization
    typeJournal Paper
    journal volume34
    journal issue5
    journal titleJournal of Performance of Constructed Facilities
    identifier doi10.1061/(ASCE)CF.1943-5509.0001493
    page12
    treeJournal of Performance of Constructed Facilities:;2020:;Volume ( 034 ):;issue: 005
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian