YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Structural Design and Construction Practice
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Structural Design and Construction Practice
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Performance of the 8.7-km Bridge Spanning Lake Maracaibo in Venezuela

    Source: Practice Periodical on Structural Design and Construction:;2020:;Volume ( 025 ):;issue: 003
    Author:
    Luis B. Fargier-Galbadón
    DOI: 10.1061/(ASCE)SC.1943-5576.0000485
    Publisher: ASCE
    Abstract: The bridge spanning Lake Maracaibo in Venezuela, also known as General Rafael Urdaneta Bridge, opened to traffic in 1962 and is frequently referred to as the first modern cable-stayed bridge with multiple spans. The structure extends over 8.7 km (5.4 mi), features six cable-stayed spans, five 235-m-long (771 ft) navigation channels, and was designed by Riccardo Morandi. The remaining spans are formed by a series of piers at variable spacing ranging from 36 to 85 m (118 to 279 ft), which receive simply supported precast prestressed girders. In February 2010, it was found that the support for one prestressed girder had failed and the beam was hanging from the end diaphragm at Pier 27. This paper presents a description of this failure, the replacement of the original supports by pot bearings in combination with flat jacks, and the use of the upper-bound and lower-bound theorems of plasticity to design the retrofitting scheme. The paper also includes a description of the structure and its performance in nearly 60 years of service, the highly corrosive environment of Lake Maracaibo, replacement of the main cable stays in 1980, and a brief comparison with the bridge in Genoa, Italy, that partially collapsed recently, also designed by Morandi.
    • Download: (6.560Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Performance of the 8.7-km Bridge Spanning Lake Maracaibo in Venezuela

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4267527
    Collections
    • Journal of Structural Design and Construction Practice

    Show full item record

    contributor authorLuis B. Fargier-Galbadón
    date accessioned2022-01-30T21:01:41Z
    date available2022-01-30T21:01:41Z
    date issued8/1/2020 12:00:00 AM
    identifier other%28ASCE%29SC.1943-5576.0000485.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4267527
    description abstractThe bridge spanning Lake Maracaibo in Venezuela, also known as General Rafael Urdaneta Bridge, opened to traffic in 1962 and is frequently referred to as the first modern cable-stayed bridge with multiple spans. The structure extends over 8.7 km (5.4 mi), features six cable-stayed spans, five 235-m-long (771 ft) navigation channels, and was designed by Riccardo Morandi. The remaining spans are formed by a series of piers at variable spacing ranging from 36 to 85 m (118 to 279 ft), which receive simply supported precast prestressed girders. In February 2010, it was found that the support for one prestressed girder had failed and the beam was hanging from the end diaphragm at Pier 27. This paper presents a description of this failure, the replacement of the original supports by pot bearings in combination with flat jacks, and the use of the upper-bound and lower-bound theorems of plasticity to design the retrofitting scheme. The paper also includes a description of the structure and its performance in nearly 60 years of service, the highly corrosive environment of Lake Maracaibo, replacement of the main cable stays in 1980, and a brief comparison with the bridge in Genoa, Italy, that partially collapsed recently, also designed by Morandi.
    publisherASCE
    titlePerformance of the 8.7-km Bridge Spanning Lake Maracaibo in Venezuela
    typeJournal Paper
    journal volume25
    journal issue3
    journal titlePractice Periodical on Structural Design and Construction
    identifier doi10.1061/(ASCE)SC.1943-5576.0000485
    page12
    treePractice Periodical on Structural Design and Construction:;2020:;Volume ( 025 ):;issue: 003
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian