YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Structural Design and Construction Practice
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Structural Design and Construction Practice
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    A Heuristic Approach to Forecasting the Delivery Time of Major Project Deliverables

    Source: Practice Periodical on Structural Design and Construction:;2020:;Volume ( 025 ):;issue: 002
    Author:
    Reza Dehghan
    ,
    Mohammad Mehdi Mortaheb
    ,
    Ali Fathalizadeh
    DOI: 10.1061/(ASCE)SC.1943-5576.0000478
    Publisher: ASCE
    Abstract: Having a simple and practical approach to forecast project milestones is extremely valuable to managers, especially in megaprojects in which the stakes are high. This paper, based on past records of similarly completed projects, suggests a heuristic method to forecast these completion times in a practical way. The findings of this study are of interest to practitioners, especially to project, portfolio, and high-ranking senior managers who seek a pragmatic forecasting of their ongoing projects. In this exploratory research, available forecasting methods used to predict the duration of a project based on the types of data sources were first reviewed. Next, a Heuristic Estimation Method (HEM) was suggested, in which data from similarly completed megaprojects are used to predict the completion time of an ongoing megaproject. This method was then tested on a selected number of ongoing offshore oil and gas megaprojects to forecast their delivery dates. At the end and upon completion, the predicted dates were compared with the actual completion dates of the selected megaprojects. Results show that the suggested approach was able to forecast the delivery dates within an acceptable margin of error.
    • Download: (294.8Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      A Heuristic Approach to Forecasting the Delivery Time of Major Project Deliverables

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4267523
    Collections
    • Journal of Structural Design and Construction Practice

    Show full item record

    contributor authorReza Dehghan
    contributor authorMohammad Mehdi Mortaheb
    contributor authorAli Fathalizadeh
    date accessioned2022-01-30T21:01:31Z
    date available2022-01-30T21:01:31Z
    date issued5/1/2020 12:00:00 AM
    identifier other%28ASCE%29SC.1943-5576.0000478.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4267523
    description abstractHaving a simple and practical approach to forecast project milestones is extremely valuable to managers, especially in megaprojects in which the stakes are high. This paper, based on past records of similarly completed projects, suggests a heuristic method to forecast these completion times in a practical way. The findings of this study are of interest to practitioners, especially to project, portfolio, and high-ranking senior managers who seek a pragmatic forecasting of their ongoing projects. In this exploratory research, available forecasting methods used to predict the duration of a project based on the types of data sources were first reviewed. Next, a Heuristic Estimation Method (HEM) was suggested, in which data from similarly completed megaprojects are used to predict the completion time of an ongoing megaproject. This method was then tested on a selected number of ongoing offshore oil and gas megaprojects to forecast their delivery dates. At the end and upon completion, the predicted dates were compared with the actual completion dates of the selected megaprojects. Results show that the suggested approach was able to forecast the delivery dates within an acceptable margin of error.
    publisherASCE
    titleA Heuristic Approach to Forecasting the Delivery Time of Major Project Deliverables
    typeJournal Paper
    journal volume25
    journal issue2
    journal titlePractice Periodical on Structural Design and Construction
    identifier doi10.1061/(ASCE)SC.1943-5576.0000478
    page7
    treePractice Periodical on Structural Design and Construction:;2020:;Volume ( 025 ):;issue: 002
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian