YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Management in Engineering
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Management in Engineering
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Rethinking the Construction Schedule Risk of Infrastructure Projects Based on Dialectical Systems and Network Theory

    Source: Journal of Management in Engineering:;2020:;Volume ( 036 ):;issue: 005
    Author:
    Long Chen
    ,
    Qiuchen Lu
    ,
    Xiaojing Zhao
    DOI: 10.1061/(ASCE)ME.1943-5479.0000829
    Publisher: ASCE
    Abstract: The construction of infrastructures is becoming increasingly complex and risky under uncertainty, which often results in construction delay. Many efforts have been made to identify and control construction schedule risks. However, previous efforts only focused on the diversity of risks with assumption that risks are independent. The ignorance of (1) interdependencies between the originalities of risks within infrastructures as a sociotechnical system, and (2) links between risks impedes the reasonable explanation for and assessment of the construction delay of infrastructures. This paper aims to develop a novel hybrid approach to address these issues based on dialectical systems and network theory. It first identified construction schedule risks from the perspective of dialectical systems at the industry level, which were further verified by global expert interviews and refined by questionnaire survey based on the Chinese infrastructure industry. Then, using network theory–based analysis, the key challenges and solutions were identified at project level based on a real infrastructure case. Seven key risks and 20 key risk links were identified with effective risk mitigation strategies provided for this case project. This research provides a new approach to understanding and analyzing construction schedule risks for better delivery of infrastructures. The results are not only helpful for the Chinese infrastructure industry, but with revisions are also applicable for other regions to improve construction schedule risk management.
    • Download: (984.5Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Rethinking the Construction Schedule Risk of Infrastructure Projects Based on Dialectical Systems and Network Theory

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4267130
    Collections
    • Journal of Management in Engineering

    Show full item record

    contributor authorLong Chen
    contributor authorQiuchen Lu
    contributor authorXiaojing Zhao
    date accessioned2022-01-30T20:47:39Z
    date available2022-01-30T20:47:39Z
    date issued9/1/2020 12:00:00 AM
    identifier other%28ASCE%29ME.1943-5479.0000829.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4267130
    description abstractThe construction of infrastructures is becoming increasingly complex and risky under uncertainty, which often results in construction delay. Many efforts have been made to identify and control construction schedule risks. However, previous efforts only focused on the diversity of risks with assumption that risks are independent. The ignorance of (1) interdependencies between the originalities of risks within infrastructures as a sociotechnical system, and (2) links between risks impedes the reasonable explanation for and assessment of the construction delay of infrastructures. This paper aims to develop a novel hybrid approach to address these issues based on dialectical systems and network theory. It first identified construction schedule risks from the perspective of dialectical systems at the industry level, which were further verified by global expert interviews and refined by questionnaire survey based on the Chinese infrastructure industry. Then, using network theory–based analysis, the key challenges and solutions were identified at project level based on a real infrastructure case. Seven key risks and 20 key risk links were identified with effective risk mitigation strategies provided for this case project. This research provides a new approach to understanding and analyzing construction schedule risks for better delivery of infrastructures. The results are not only helpful for the Chinese infrastructure industry, but with revisions are also applicable for other regions to improve construction schedule risk management.
    publisherASCE
    titleRethinking the Construction Schedule Risk of Infrastructure Projects Based on Dialectical Systems and Network Theory
    typeJournal Paper
    journal volume36
    journal issue5
    journal titleJournal of Management in Engineering
    identifier doi10.1061/(ASCE)ME.1943-5479.0000829
    page18
    treeJournal of Management in Engineering:;2020:;Volume ( 036 ):;issue: 005
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian