YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Management in Engineering
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Management in Engineering
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Integrating Corrective Actions in Project Time Forecasting Using Exponential Smoothing

    Source: Journal of Management in Engineering:;2020:;Volume ( 036 ):;issue: 005
    Author:
    Annelies Martens
    ,
    Mario Vanhoucke
    DOI: 10.1061/(ASCE)ME.1943-5479.0000806
    Publisher: ASCE
    Abstract: Earned value management (EVM) and earned duration management (EDM) are established methodologies to monitor the project performance during execution. These methods serve as a basis to forecast the final project duration and/or project cost. The aim of this paper is to improve the accuracy of project time forecasting by extending exponential smoothing for project time forecasting using EVM and EDM with the integration of corrective actions that are taken during project progress. In order to evaluate the forecasting accuracy of this approach, eight projects conducted in recent years have been followed up in real time. Based on the nature of the observed corrective actions, six distinct categories of corrective actions are identified. The empirical experiment showed that explicitly integrating the occurrence of corrective actions into the forecasting process improves the forecasting accuracy of traditional forecasting methods and forecasting methods using standard exponential smoothing, especially for the middle and late phases of projects. Consequently, by including corrective actions in the forecasting process, project managers can predict the final project duration more accurately.
    • Download: (385.5Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Integrating Corrective Actions in Project Time Forecasting Using Exponential Smoothing

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4267103
    Collections
    • Journal of Management in Engineering

    Show full item record

    contributor authorAnnelies Martens
    contributor authorMario Vanhoucke
    date accessioned2022-01-30T20:46:52Z
    date available2022-01-30T20:46:52Z
    date issued9/1/2020 12:00:00 AM
    identifier other%28ASCE%29ME.1943-5479.0000806.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4267103
    description abstractEarned value management (EVM) and earned duration management (EDM) are established methodologies to monitor the project performance during execution. These methods serve as a basis to forecast the final project duration and/or project cost. The aim of this paper is to improve the accuracy of project time forecasting by extending exponential smoothing for project time forecasting using EVM and EDM with the integration of corrective actions that are taken during project progress. In order to evaluate the forecasting accuracy of this approach, eight projects conducted in recent years have been followed up in real time. Based on the nature of the observed corrective actions, six distinct categories of corrective actions are identified. The empirical experiment showed that explicitly integrating the occurrence of corrective actions into the forecasting process improves the forecasting accuracy of traditional forecasting methods and forecasting methods using standard exponential smoothing, especially for the middle and late phases of projects. Consequently, by including corrective actions in the forecasting process, project managers can predict the final project duration more accurately.
    publisherASCE
    titleIntegrating Corrective Actions in Project Time Forecasting Using Exponential Smoothing
    typeJournal Paper
    journal volume36
    journal issue5
    journal titleJournal of Management in Engineering
    identifier doi10.1061/(ASCE)ME.1943-5479.0000806
    page10
    treeJournal of Management in Engineering:;2020:;Volume ( 036 ):;issue: 005
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian