YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Management in Engineering
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Management in Engineering
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Cost Performance and Cost Contingency during Project Execution: Comparing Client and Contractor Perspectives

    Source: Journal of Management in Engineering:;2020:;Volume ( 036 ):;issue: 004
    Author:
    Erfan Hoseini
    ,
    Pim van Veen
    ,
    Marian Bosch-Rekveldt
    ,
    Marcel Hertogh
    DOI: 10.1061/(ASCE)ME.1943-5479.0000772
    Publisher: ASCE
    Abstract: Current literature shows that poor cost performance in projects has become routine. Research on cost performance has mostly focused on one of the involved parties, either the client or the contractor. Not many research efforts discuss the cost contingency performance of projects. This research discusses the cost performance and cost contingency of projects in the execution phase from the perspective of a client as well as a contractor. Using a case study approach, 95 projects are investigated: 44 client projects and 51 contractor projects. The results show that depending on the perspective, projects can have cost overruns or cost underruns. Comparing the total realized and estimated costs, projects experienced on average about 16% underrun from a client perspective. From a contractor perspective, projects experienced on average up to 2% overrun. The estimated cost contingency in the client’s projects was on average 2.64% more than the required cost contingency. The estimated cost contingency in the contractor’s projects was on average 5.41% less than the required cost contingency. These differences are explained by pessimism bias and technical reasons on the client’s side. On the contractor side, optimism bias and technical and political reasons play a role, resulting in opportunistic behavior. The findings help practitioners to enhance their cost estimates by avoiding both pessimistic bias and optimism bias behavior—for example, by using historical data from earlier projects. Further investigation into the influence of market conditions on cost estimates is suggested.
    • Download: (1.245Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Cost Performance and Cost Contingency during Project Execution: Comparing Client and Contractor Perspectives

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4267091
    Collections
    • Journal of Management in Engineering

    Show full item record

    contributor authorErfan Hoseini
    contributor authorPim van Veen
    contributor authorMarian Bosch-Rekveldt
    contributor authorMarcel Hertogh
    date accessioned2022-01-30T20:46:28Z
    date available2022-01-30T20:46:28Z
    date issued7/1/2020 12:00:00 AM
    identifier other%28ASCE%29ME.1943-5479.0000772.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4267091
    description abstractCurrent literature shows that poor cost performance in projects has become routine. Research on cost performance has mostly focused on one of the involved parties, either the client or the contractor. Not many research efforts discuss the cost contingency performance of projects. This research discusses the cost performance and cost contingency of projects in the execution phase from the perspective of a client as well as a contractor. Using a case study approach, 95 projects are investigated: 44 client projects and 51 contractor projects. The results show that depending on the perspective, projects can have cost overruns or cost underruns. Comparing the total realized and estimated costs, projects experienced on average about 16% underrun from a client perspective. From a contractor perspective, projects experienced on average up to 2% overrun. The estimated cost contingency in the client’s projects was on average 2.64% more than the required cost contingency. The estimated cost contingency in the contractor’s projects was on average 5.41% less than the required cost contingency. These differences are explained by pessimism bias and technical reasons on the client’s side. On the contractor side, optimism bias and technical and political reasons play a role, resulting in opportunistic behavior. The findings help practitioners to enhance their cost estimates by avoiding both pessimistic bias and optimism bias behavior—for example, by using historical data from earlier projects. Further investigation into the influence of market conditions on cost estimates is suggested.
    publisherASCE
    titleCost Performance and Cost Contingency during Project Execution: Comparing Client and Contractor Perspectives
    typeJournal Paper
    journal volume36
    journal issue4
    journal titleJournal of Management in Engineering
    identifier doi10.1061/(ASCE)ME.1943-5479.0000772
    page13
    treeJournal of Management in Engineering:;2020:;Volume ( 036 ):;issue: 004
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian