YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Concurrent Delay Analysis: Methods, Case Law, and Expert Perception

    Source: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction:;2020:;Volume ( 012 ):;issue: 001
    Author:
    Chintan Munvar
    ,
    Desalegn Girma Mengistu
    ,
    Gangadhar Mahesh
    DOI: 10.1061/(ASCE)LA.1943-4170.0000343
    Publisher: ASCE
    Abstract: Concurrent delays in a project schedule are due to two or more independent delay events occurring during the same time period. There arise difficulties in attributing responsibility for these delays and in deciding the manner in which they are to be dealt with, as they are typically complex and intertwined. While various approaches and professional guidelines are followed internationally, a thorough study in the Indian context is lacking. Hence, it is essential to recognize the nature and effects of concurrent delays that the Indian industry is facing. In this regard, cases in India were analyzed to understand the nature of concurrent delays, strategies adopted, and legal issues. Also, a survey of arbitrators and professionals with experience in delay disputes was conducted to (1) identify current approaches to concurrent delays in India and (2) determine the appropriateness of and challenges in applying approaches from the literature. In India, shortfalls exist in project management processes and protocols. Also, documentation and information management systems are poor. These failings act as barriers to adopting advanced global practices. In this regard, the findings of this work are expected to help in standardizing approaches to concurrent delay analysis and in streamlining necessary process protocols in the Indian construction industry.
    • Download: (178.3Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Concurrent Delay Analysis: Methods, Case Law, and Expert Perception

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4267050
    Collections
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction

    Show full item record

    contributor authorChintan Munvar
    contributor authorDesalegn Girma Mengistu
    contributor authorGangadhar Mahesh
    date accessioned2022-01-30T20:45:11Z
    date available2022-01-30T20:45:11Z
    date issued2/1/2020 12:00:00 AM
    identifier other%28ASCE%29LA.1943-4170.0000343.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4267050
    description abstractConcurrent delays in a project schedule are due to two or more independent delay events occurring during the same time period. There arise difficulties in attributing responsibility for these delays and in deciding the manner in which they are to be dealt with, as they are typically complex and intertwined. While various approaches and professional guidelines are followed internationally, a thorough study in the Indian context is lacking. Hence, it is essential to recognize the nature and effects of concurrent delays that the Indian industry is facing. In this regard, cases in India were analyzed to understand the nature of concurrent delays, strategies adopted, and legal issues. Also, a survey of arbitrators and professionals with experience in delay disputes was conducted to (1) identify current approaches to concurrent delays in India and (2) determine the appropriateness of and challenges in applying approaches from the literature. In India, shortfalls exist in project management processes and protocols. Also, documentation and information management systems are poor. These failings act as barriers to adopting advanced global practices. In this regard, the findings of this work are expected to help in standardizing approaches to concurrent delay analysis and in streamlining necessary process protocols in the Indian construction industry.
    publisherASCE
    titleConcurrent Delay Analysis: Methods, Case Law, and Expert Perception
    typeJournal Paper
    journal volume12
    journal issue1
    journal titleJournal of Legal Affairs and Dispute Resolution in Engineering and Construction
    identifier doi10.1061/(ASCE)LA.1943-4170.0000343
    page8
    treeJournal of Legal Affairs and Dispute Resolution in Engineering and Construction:;2020:;Volume ( 012 ):;issue: 001
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian