YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Causes, Effects, and Mitigations Framework of Contract Change Orders: Lessons Learned from GBK Aquatic Stadium Project

    Source: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction:;2020:;Volume ( 012 ):;issue: 001
    Author:
    Seng Hansen
    ,
    Susy F. Rostiyanti
    ,
    Aggam Rif’at
    DOI: 10.1061/(ASCE)LA.1943-4170.0000341
    Publisher: ASCE
    Abstract: Contract change orders (CCOs) are an interesting topic in the discipline of construction contract management. CCOs are changes in construction work or scope that alter the original contract amount and/or completion date. There are several common causes of CCOs, including design changes, scope changes, and force majeures. If not managed carefully, CCOs may result in poor project performance or contract termination. However, no previous qualitative research that has examined the causes and effects of CCOs in Indonesia. The objective of this study was to identify the causes and effects of CCOs from an actual project as a case study. Data was collected using multiple qualitative approaches, including study of literature, site visits, document examination, and semistructured expert interviews. The project examined was a major renovation project in Jakarta, Indonesia, that is, the Gelora Bung Karno (GBK) Aquatic Stadium project. Four expert interviews were conducted in order to achieve the aforementioned objectives. The study revealed six causes and one effect of CCOs occurring in the project. Based on these findings and coupled with a systematic approach this study also provides a framework for minimizing the effects of CCOs. This framework is useful for improving contract management practices and could be applied by other countries experiencing similar challenges.
    • Download: (462.3Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Causes, Effects, and Mitigations Framework of Contract Change Orders: Lessons Learned from GBK Aquatic Stadium Project

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4267049
    Collections
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction

    Show full item record

    contributor authorSeng Hansen
    contributor authorSusy F. Rostiyanti
    contributor authorAggam Rif’at
    date accessioned2022-01-30T20:45:07Z
    date available2022-01-30T20:45:07Z
    date issued2/1/2020 12:00:00 AM
    identifier other%28ASCE%29LA.1943-4170.0000341.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4267049
    description abstractContract change orders (CCOs) are an interesting topic in the discipline of construction contract management. CCOs are changes in construction work or scope that alter the original contract amount and/or completion date. There are several common causes of CCOs, including design changes, scope changes, and force majeures. If not managed carefully, CCOs may result in poor project performance or contract termination. However, no previous qualitative research that has examined the causes and effects of CCOs in Indonesia. The objective of this study was to identify the causes and effects of CCOs from an actual project as a case study. Data was collected using multiple qualitative approaches, including study of literature, site visits, document examination, and semistructured expert interviews. The project examined was a major renovation project in Jakarta, Indonesia, that is, the Gelora Bung Karno (GBK) Aquatic Stadium project. Four expert interviews were conducted in order to achieve the aforementioned objectives. The study revealed six causes and one effect of CCOs occurring in the project. Based on these findings and coupled with a systematic approach this study also provides a framework for minimizing the effects of CCOs. This framework is useful for improving contract management practices and could be applied by other countries experiencing similar challenges.
    publisherASCE
    titleCauses, Effects, and Mitigations Framework of Contract Change Orders: Lessons Learned from GBK Aquatic Stadium Project
    typeJournal Paper
    journal volume12
    journal issue1
    journal titleJournal of Legal Affairs and Dispute Resolution in Engineering and Construction
    identifier doi10.1061/(ASCE)LA.1943-4170.0000341
    page8
    treeJournal of Legal Affairs and Dispute Resolution in Engineering and Construction:;2020:;Volume ( 012 ):;issue: 001
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian