YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Design-Build for Transportation Projects: Cost and Schedule Change Performance Analysis

    Source: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction:;2020:;Volume ( 012 ):;issue: 001
    Author:
    Mounir El Asmar
    ,
    David Ramsey
    ,
    G. Edward Gibson
    ,
    Wylie Bearup
    DOI: 10.1061/(ASCE)LA.1943-4170.0000335
    Publisher: ASCE
    Abstract: Design-build (DB) is an alternative project delivery method that has been used to great effect in transportation project delivery. Measuring the performance of DB projects has been the subject of many research studies. However, the collective results of these studies are difficult to interpret because they extend over decades. This paper seeks to synthesize the past 20 years of DB transportation performance literature, collect data from 47 public DB transportation projects, and compare performance results with those published in the literature. Statistical comparisons are made between the collected DB data and the transportation DB literature in order to determine if there are any performance differences in this new data set versus previously published literature. Results from the performance analysis show that DB has a median cost change of 4% and a median schedule change of zero. This study contributes to the body of knowledge by analyzing project data from 47 public DB transportation projects and combining performance outcomes with two decades of published DB performance transportation literature. The findings consistently show that DB can offer superior performance compared with the traditional design-bid-build method.
    • Download: (839.7Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Design-Build for Transportation Projects: Cost and Schedule Change Performance Analysis

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4267046
    Collections
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction

    Show full item record

    contributor authorMounir El Asmar
    contributor authorDavid Ramsey
    contributor authorG. Edward Gibson
    contributor authorWylie Bearup
    date accessioned2022-01-30T20:45:04Z
    date available2022-01-30T20:45:04Z
    date issued2/1/2020 12:00:00 AM
    identifier other%28ASCE%29LA.1943-4170.0000335.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4267046
    description abstractDesign-build (DB) is an alternative project delivery method that has been used to great effect in transportation project delivery. Measuring the performance of DB projects has been the subject of many research studies. However, the collective results of these studies are difficult to interpret because they extend over decades. This paper seeks to synthesize the past 20 years of DB transportation performance literature, collect data from 47 public DB transportation projects, and compare performance results with those published in the literature. Statistical comparisons are made between the collected DB data and the transportation DB literature in order to determine if there are any performance differences in this new data set versus previously published literature. Results from the performance analysis show that DB has a median cost change of 4% and a median schedule change of zero. This study contributes to the body of knowledge by analyzing project data from 47 public DB transportation projects and combining performance outcomes with two decades of published DB performance transportation literature. The findings consistently show that DB can offer superior performance compared with the traditional design-bid-build method.
    publisherASCE
    titleDesign-Build for Transportation Projects: Cost and Schedule Change Performance Analysis
    typeJournal Paper
    journal volume12
    journal issue1
    journal titleJournal of Legal Affairs and Dispute Resolution in Engineering and Construction
    identifier doi10.1061/(ASCE)LA.1943-4170.0000335
    page12
    treeJournal of Legal Affairs and Dispute Resolution in Engineering and Construction:;2020:;Volume ( 012 ):;issue: 001
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian