YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Bridge Engineering
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Bridge Engineering
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Evaluation of Pretensioned Girders with Partial-Strand Debonding

    Source: Journal of Bridge Engineering:;2020:;Volume ( 025 ):;issue: 008
    Author:
    Mathew W. Bolduc
    ,
    Avdhesh Gaur
    ,
    Bahram M. Shahrooz
    ,
    Kent A. Harries
    ,
    Richard A. Miller
    ,
    Henry G. Russell
    DOI: 10.1061/(ASCE)BE.1943-5592.0001585
    Publisher: ASCE
    Abstract: Pretensioned concrete girders—especially those having large prestress forces—are susceptible to flexural cracking at their top flanges near the girder end as a result of prestress transfer. One effective method to reduce such extreme-fiber stresses is to partially debond some of the strands. The 2017 edition of AASHTO LRFD Bridge Design Specifications provides limits on the number of strands that can be debonded at a given location and in each row of strands. The limits are attributed to an experimental study in which the test specimens were designed under the previous AASHTO Standard Specifications. Some states have allowed the AASHTO limits to be exceeded, while others have adhered to the limits. National Cooperative Highway Research Program Project 12-91 Strand Debonding for Pretensioned Girders was initiated to develop a unified approach to the design of partially debonded strand details in prestressed concrete bridge girders. Detailed design case studies and synthesis of experimental data suggest that the debonding ratio is not a sufficient metric by itself to gauge the performance and capacity of prestressed concrete girders. Despite having a greater extent of debonding than the 2017 AASHTO limits, girders meeting the requirements for shear and longitudinal reinforcement in end regions are expected to perform adequately in terms of strength, deformability, stiffness, crack widths, and modes of failure.
    • Download: (940.5Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Evaluation of Pretensioned Girders with Partial-Strand Debonding

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4266895
    Collections
    • Journal of Bridge Engineering

    Show full item record

    contributor authorMathew W. Bolduc
    contributor authorAvdhesh Gaur
    contributor authorBahram M. Shahrooz
    contributor authorKent A. Harries
    contributor authorRichard A. Miller
    contributor authorHenry G. Russell
    date accessioned2022-01-30T20:39:39Z
    date available2022-01-30T20:39:39Z
    date issued8/1/2020 12:00:00 AM
    identifier other%28ASCE%29BE.1943-5592.0001585.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4266895
    description abstractPretensioned concrete girders—especially those having large prestress forces—are susceptible to flexural cracking at their top flanges near the girder end as a result of prestress transfer. One effective method to reduce such extreme-fiber stresses is to partially debond some of the strands. The 2017 edition of AASHTO LRFD Bridge Design Specifications provides limits on the number of strands that can be debonded at a given location and in each row of strands. The limits are attributed to an experimental study in which the test specimens were designed under the previous AASHTO Standard Specifications. Some states have allowed the AASHTO limits to be exceeded, while others have adhered to the limits. National Cooperative Highway Research Program Project 12-91 Strand Debonding for Pretensioned Girders was initiated to develop a unified approach to the design of partially debonded strand details in prestressed concrete bridge girders. Detailed design case studies and synthesis of experimental data suggest that the debonding ratio is not a sufficient metric by itself to gauge the performance and capacity of prestressed concrete girders. Despite having a greater extent of debonding than the 2017 AASHTO limits, girders meeting the requirements for shear and longitudinal reinforcement in end regions are expected to perform adequately in terms of strength, deformability, stiffness, crack widths, and modes of failure.
    publisherASCE
    titleEvaluation of Pretensioned Girders with Partial-Strand Debonding
    typeJournal Paper
    journal volume25
    journal issue8
    journal titleJournal of Bridge Engineering
    identifier doi10.1061/(ASCE)BE.1943-5592.0001585
    page9
    treeJournal of Bridge Engineering:;2020:;Volume ( 025 ):;issue: 008
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian