Comparative Study on the Early Stage of Skid Resistance Development between Polyurethane-Bound Porous Mixture and Asphalt MixtureSource: Journal of Materials in Civil Engineering:;2020:;Volume ( 032 ):;issue: 007DOI: 10.1061/(ASCE)MT.1943-5533.0003234Publisher: ASCE
Abstract: Polyurethane-bound porous mixture (PPM) is a new type of pavement material that has shown some potential for overcoming common asphalt mixtures mechanical failures. However, little research has been done on its skid resistance performance. This work presents a comparative study of the skid resistance development between PPM and asphalt mixtures at their early stage. In this study, the three mixtures were bonded by three type binders. The three type binders were polyurethane, 70# virgin bitumen, and styrene–butadiene–styrene (SBS) modified asphalt. In order to distinguished the three type mixtures, we named them PPM, BAM, and SAM respectively. A Taber abraser was used to test the polishing property of binders. A third-scale model mobile loading simulator (MMLS3) was used to simulate the traffic loadings on mixtures, and a British pendulum tester was used to measure the skid resistance of the three types of mixtures in the loading process. The binder polishing test results show a good linear relationship between the binder’s mass loss and the polishing cycle. The slope of the fitting line of the two parameters was defined as binder coefficient (BC) to characterize the polishing property of the binder. The mixture test results show that the skid resistance development trend of three mixtures is similar, as it first increases, then decreases, then finally flattens. However, the British pendulum number peak value and stable value of PPM are lower than that of SAM. The order of the number of loading times of peak (NLTP) of the three mixtures is SAM>PPM>BAM. Another good linear relationship is found between BC and NLTP, and the R2 of the fitting model is 0.85, which indicates that the polishing property of binder is effective for predicting the moment of occurrence of the mixture skid resistance peak.
|
Collections
Show full item record
| contributor author | Jiachen Shi | |
| contributor author | Lin Cong | |
| contributor author | Fan Yang | |
| contributor author | Tongjing Wang | |
| contributor author | Le Tan | |
| contributor author | Meng Yu | |
| date accessioned | 2022-01-30T20:00:30Z | |
| date available | 2022-01-30T20:00:30Z | |
| date issued | 2020 | |
| identifier other | %28ASCE%29MT.1943-5533.0003234.pdf | |
| identifier uri | http://yetl.yabesh.ir/yetl1/handle/yetl/4266356 | |
| description abstract | Polyurethane-bound porous mixture (PPM) is a new type of pavement material that has shown some potential for overcoming common asphalt mixtures mechanical failures. However, little research has been done on its skid resistance performance. This work presents a comparative study of the skid resistance development between PPM and asphalt mixtures at their early stage. In this study, the three mixtures were bonded by three type binders. The three type binders were polyurethane, 70# virgin bitumen, and styrene–butadiene–styrene (SBS) modified asphalt. In order to distinguished the three type mixtures, we named them PPM, BAM, and SAM respectively. A Taber abraser was used to test the polishing property of binders. A third-scale model mobile loading simulator (MMLS3) was used to simulate the traffic loadings on mixtures, and a British pendulum tester was used to measure the skid resistance of the three types of mixtures in the loading process. The binder polishing test results show a good linear relationship between the binder’s mass loss and the polishing cycle. The slope of the fitting line of the two parameters was defined as binder coefficient (BC) to characterize the polishing property of the binder. The mixture test results show that the skid resistance development trend of three mixtures is similar, as it first increases, then decreases, then finally flattens. However, the British pendulum number peak value and stable value of PPM are lower than that of SAM. The order of the number of loading times of peak (NLTP) of the three mixtures is SAM>PPM>BAM. Another good linear relationship is found between BC and NLTP, and the R2 of the fitting model is 0.85, which indicates that the polishing property of binder is effective for predicting the moment of occurrence of the mixture skid resistance peak. | |
| publisher | ASCE | |
| title | Comparative Study on the Early Stage of Skid Resistance Development between Polyurethane-Bound Porous Mixture and Asphalt Mixture | |
| type | Journal Paper | |
| journal volume | 32 | |
| journal issue | 7 | |
| journal title | Journal of Materials in Civil Engineering | |
| identifier doi | 10.1061/(ASCE)MT.1943-5533.0003234 | |
| page | 04020164 | |
| tree | Journal of Materials in Civil Engineering:;2020:;Volume ( 032 ):;issue: 007 | |
| contenttype | Fulltext |