YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Management in Engineering
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Management in Engineering
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Using System Dynamics for Strategic Performance Management in Construction

    Source: Journal of Management in Engineering:;2020:;Volume ( 036 ):;issue: 002
    Author:
    Acelya Ecem Yildiz
    ,
    Irem Dikmen
    ,
    M. Talat Birgonul
    DOI: 10.1061/(ASCE)ME.1943-5479.0000744
    Publisher: ASCE
    Abstract: Balanced scorecard (BSC) and strategy maps (SMs) are among the most popular strategic performance management methods that have been proposed in the literature to define, analyze, and monitor performance and strategies. Despite their popularity, BSC and SMs have been criticized for their inability to simulate dynamic interrelations between performance measures and strategies over time. In this paper, a dynamic SM was developed by using system dynamics (SD) modeling based on the BSC framework. This paper describes the dynamic SM, which was conceptualized, formulated, tested, and simulated in collaboration with a construction company, as well as the experiences gained during the model development process. Simulation tests demonstrated that dynamic SMs can be used to improve strategic decision making by assessing the impact of strategies on aggregated measures of performance under different scenarios considering changes in internal processes as well as external conditions. However, the findings also revealed that SD models can have some limitations due to problems of generalization, usability, and validity. The model development process and dynamic SM structure proposed in this study can be used by other companies and researchers to develop similar models and to discover potential limitations of SD modeling.
    • Download: (905.4Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Using System Dynamics for Strategic Performance Management in Construction

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4266061
    Collections
    • Journal of Management in Engineering

    Show full item record

    contributor authorAcelya Ecem Yildiz
    contributor authorIrem Dikmen
    contributor authorM. Talat Birgonul
    date accessioned2022-01-30T19:50:08Z
    date available2022-01-30T19:50:08Z
    date issued2020
    identifier other%28ASCE%29ME.1943-5479.0000744.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4266061
    description abstractBalanced scorecard (BSC) and strategy maps (SMs) are among the most popular strategic performance management methods that have been proposed in the literature to define, analyze, and monitor performance and strategies. Despite their popularity, BSC and SMs have been criticized for their inability to simulate dynamic interrelations between performance measures and strategies over time. In this paper, a dynamic SM was developed by using system dynamics (SD) modeling based on the BSC framework. This paper describes the dynamic SM, which was conceptualized, formulated, tested, and simulated in collaboration with a construction company, as well as the experiences gained during the model development process. Simulation tests demonstrated that dynamic SMs can be used to improve strategic decision making by assessing the impact of strategies on aggregated measures of performance under different scenarios considering changes in internal processes as well as external conditions. However, the findings also revealed that SD models can have some limitations due to problems of generalization, usability, and validity. The model development process and dynamic SM structure proposed in this study can be used by other companies and researchers to develop similar models and to discover potential limitations of SD modeling.
    publisherASCE
    titleUsing System Dynamics for Strategic Performance Management in Construction
    typeJournal Paper
    journal volume36
    journal issue2
    journal titleJournal of Management in Engineering
    identifier doi10.1061/(ASCE)ME.1943-5479.0000744
    page04019051
    treeJournal of Management in Engineering:;2020:;Volume ( 036 ):;issue: 002
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian