YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Lessons Learned in Design-Build and Construction-Manager-at-Risk Water and Wastewater Project

    Source: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction:;2020:;Volume ( 012 ):;issue: 002
    Author:
    Pramen P. Shrestha
    ,
    Jacimaria Batista
    DOI: 10.1061/(ASCE)LA.1943-4170.0000376
    Publisher: ASCE
    Abstract: The use of design-build (DB) and construction-manger-at-risk (CMAR) delivery methods have increased significantly in water and wastewater projects. Water and wastewater owners are at the forefront of using these alternative delivery methods in their projects. These owners have also developed contract documents and owners’ manuals related to the use of these delivery methods in both water and wastewater projects. Therefore, these owners and their staffs are highly experienced in using these alternative delivery methods. For this reason, the authors conducted an interview with 15 project managers (PMs) to identify lessons learned related to the contract procurement, design, construction, operation, and maintenance phases of these projects. The PMs were asked about how DB and CMAR projects can be procured and implemented so that there is a lower probability of disputes or claims on the projects. This study collected lessons learned from each phase of the projects that will be useful for PMs toward implementing these delivery methods in their future projects without having claims and/or disputes. Recommendations regarding key factors to be considered during all phases of the projects, in order to make DB and CMAR projects more successful, will also be discussed.
    • Download: (975.5Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Lessons Learned in Design-Build and Construction-Manager-at-Risk Water and Wastewater Project

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4266008
    Collections
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction

    Show full item record

    contributor authorPramen P. Shrestha
    contributor authorJacimaria Batista
    date accessioned2022-01-30T19:48:15Z
    date available2022-01-30T19:48:15Z
    date issued2020
    identifier other%28ASCE%29LA.1943-4170.0000376.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4266008
    description abstractThe use of design-build (DB) and construction-manger-at-risk (CMAR) delivery methods have increased significantly in water and wastewater projects. Water and wastewater owners are at the forefront of using these alternative delivery methods in their projects. These owners have also developed contract documents and owners’ manuals related to the use of these delivery methods in both water and wastewater projects. Therefore, these owners and their staffs are highly experienced in using these alternative delivery methods. For this reason, the authors conducted an interview with 15 project managers (PMs) to identify lessons learned related to the contract procurement, design, construction, operation, and maintenance phases of these projects. The PMs were asked about how DB and CMAR projects can be procured and implemented so that there is a lower probability of disputes or claims on the projects. This study collected lessons learned from each phase of the projects that will be useful for PMs toward implementing these delivery methods in their future projects without having claims and/or disputes. Recommendations regarding key factors to be considered during all phases of the projects, in order to make DB and CMAR projects more successful, will also be discussed.
    publisherASCE
    titleLessons Learned in Design-Build and Construction-Manager-at-Risk Water and Wastewater Project
    typeJournal Paper
    journal volume12
    journal issue2
    journal titleJournal of Legal Affairs and Dispute Resolution in Engineering and Construction
    identifier doi10.1061/(ASCE)LA.1943-4170.0000376
    page04520002
    treeJournal of Legal Affairs and Dispute Resolution in Engineering and Construction:;2020:;Volume ( 012 ):;issue: 002
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian