YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Explaining Delays in Construction Arbitration: A Process-Control Model Approach

    Source: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction:;2020:;Volume ( 012 ):;issue: 002
    Author:
    Allan A. Abwunza
    ,
    Titus K. Peter
    ,
    Kariuki Muigua
    DOI: 10.1061/(ASCE)LA.1943-4170.0000371
    Publisher: ASCE
    Abstract: Persistent delays remain a major concern to many users of construction arbitration. Despite concerted attempts to identify the causes, the existing literature has made little effort toward explaining why these delays occur. The aim of this paper is to report on the findings of a qualitative case study undertaken to explain the causes of these delays based on the control model of procedural justice. Relying on documentary analysis and 13 in-depth semistructured interviews of participants in five cases, findings suggest that all the cases experienced delays. These delays were attributed to the tribunals’ failure to streamline proceedings when process control was skewed in favor of one party. The research contributes to knowledge by extending the application of the process-control model of procedural justice from its earlier application in explaining outcomes in decision-making contexts to its use in explaining the causes of delays in construction arbitration. These findings provide a more nuanced understanding of the causes and form the basis upon which measures aimed at minimizing these delays are proposed.
    • Download: (212.2Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Explaining Delays in Construction Arbitration: A Process-Control Model Approach

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4266004
    Collections
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction

    Show full item record

    contributor authorAllan A. Abwunza
    contributor authorTitus K. Peter
    contributor authorKariuki Muigua
    date accessioned2022-01-30T19:48:04Z
    date available2022-01-30T19:48:04Z
    date issued2020
    identifier other%28ASCE%29LA.1943-4170.0000371.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4266004
    description abstractPersistent delays remain a major concern to many users of construction arbitration. Despite concerted attempts to identify the causes, the existing literature has made little effort toward explaining why these delays occur. The aim of this paper is to report on the findings of a qualitative case study undertaken to explain the causes of these delays based on the control model of procedural justice. Relying on documentary analysis and 13 in-depth semistructured interviews of participants in five cases, findings suggest that all the cases experienced delays. These delays were attributed to the tribunals’ failure to streamline proceedings when process control was skewed in favor of one party. The research contributes to knowledge by extending the application of the process-control model of procedural justice from its earlier application in explaining outcomes in decision-making contexts to its use in explaining the causes of delays in construction arbitration. These findings provide a more nuanced understanding of the causes and form the basis upon which measures aimed at minimizing these delays are proposed.
    publisherASCE
    titleExplaining Delays in Construction Arbitration: A Process-Control Model Approach
    typeJournal Paper
    journal volume12
    journal issue2
    journal titleJournal of Legal Affairs and Dispute Resolution in Engineering and Construction
    identifier doi10.1061/(ASCE)LA.1943-4170.0000371
    page04520003
    treeJournal of Legal Affairs and Dispute Resolution in Engineering and Construction:;2020:;Volume ( 012 ):;issue: 002
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian