YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Infrastructure Systems
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Infrastructure Systems
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Rethinking Risk Propagation Mechanism in Public–Private Partnership Projects: Network Perspective

    Source: Journal of Infrastructure Systems:;2020:;Volume ( 026 ):;issue: 002
    Author:
    Yating Zhang
    ,
    Chung-Han Tsai
    ,
    Pin-Chao Liao
    DOI: 10.1061/(ASCE)IS.1943-555X.0000538
    Publisher: ASCE
    Abstract: A large portion of public–private partnership (PPP) infrastructure projects in China have ceased without delivery, which has drawn attention to the need for effective risk management. Previous studies directly and/or independently correlated risks with consequences. This does not allow for an effective investigation of causal chain and propagation effects among risks. To address this research gap, this paper developed a risk network model to analyze risk interactions and their propagation mechanism in PPP infrastructure projects. A case study of a PPP water supply project in China highlighted the key risks and mitigation actions. The study showed that policy change is frequently a source of risk, government default is profoundly affected by other risks, and safety accidents are one of the critical risks leading to project failure, which previous studies have overlooked. Furthermore, PPP stakeholders should focus on decoupling the following risks to reduce the probability of PPP project failure: safety accidents caused by lack of managing/organizational ability, and safety accidents caused by insufficient/delayed financing. The results indicated that the risk network model can be applied in PPP risk analysis to identify unnoticed but pivotal risks with propagation effects. This paper contributes to the research on PPP project risk management in three ways. First, it encourages both theorists and practitioners to consider PPP risk management as a dynamic, nonlinear process. Second, it illuminates critical risks and propagation mechanisms that have been overlooked by previous studies, thereby supplementing the body of knowledge on PPP project governance/management. Additionally, it proposes effective mitigation actions within risk management practice, thus laying the foundation for management and governance strategies.
    • Download: (965.6Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Rethinking Risk Propagation Mechanism in Public–Private Partnership Projects: Network Perspective

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4265967
    Collections
    • Journal of Infrastructure Systems

    Show full item record

    contributor authorYating Zhang
    contributor authorChung-Han Tsai
    contributor authorPin-Chao Liao
    date accessioned2022-01-30T19:46:49Z
    date available2022-01-30T19:46:49Z
    date issued2020
    identifier other%28ASCE%29IS.1943-555X.0000538.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4265967
    description abstractA large portion of public–private partnership (PPP) infrastructure projects in China have ceased without delivery, which has drawn attention to the need for effective risk management. Previous studies directly and/or independently correlated risks with consequences. This does not allow for an effective investigation of causal chain and propagation effects among risks. To address this research gap, this paper developed a risk network model to analyze risk interactions and their propagation mechanism in PPP infrastructure projects. A case study of a PPP water supply project in China highlighted the key risks and mitigation actions. The study showed that policy change is frequently a source of risk, government default is profoundly affected by other risks, and safety accidents are one of the critical risks leading to project failure, which previous studies have overlooked. Furthermore, PPP stakeholders should focus on decoupling the following risks to reduce the probability of PPP project failure: safety accidents caused by lack of managing/organizational ability, and safety accidents caused by insufficient/delayed financing. The results indicated that the risk network model can be applied in PPP risk analysis to identify unnoticed but pivotal risks with propagation effects. This paper contributes to the research on PPP project risk management in three ways. First, it encourages both theorists and practitioners to consider PPP risk management as a dynamic, nonlinear process. Second, it illuminates critical risks and propagation mechanisms that have been overlooked by previous studies, thereby supplementing the body of knowledge on PPP project governance/management. Additionally, it proposes effective mitigation actions within risk management practice, thus laying the foundation for management and governance strategies.
    publisherASCE
    titleRethinking Risk Propagation Mechanism in Public–Private Partnership Projects: Network Perspective
    typeJournal Paper
    journal volume26
    journal issue2
    journal titleJournal of Infrastructure Systems
    identifier doi10.1061/(ASCE)IS.1943-555X.0000538
    page04020011
    treeJournal of Infrastructure Systems:;2020:;Volume ( 026 ):;issue: 002
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian