YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Understanding Extension of Time under Different Standard Design-Build Forms of Contract

    Source: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction:;2020:;Volume ( 012 ):;issue: 001
    Author:
    Islam H. El-adaway
    ,
    Ricky A. Vance
    ,
    Ibrahim S. Abotaleb
    DOI: 10.1061/(ASCE)LA.1943-4170.0000331
    Publisher: ASCE
    Abstract: Contractual provisions related to delay and extension of time are often written in difficult language or presented in a scattered manner in construction contracts. This could lead to confusion and misunderstanding by the different parties as to rights and responsibilities. Thus, it is not surprising that poor contract administration is always listed among the top reasons for conflicts, claims, and disputes in the construction industry. The goal of this paper is to present contract administration guidelines for appropriate utilization of the provisions related to extension of time under the most widely used standard design-build contracts. This is particularly valuable bearing in mind the complexity of addressing construction delays in general, as well as the growing popularity of design-build delivery methods in particular. To address this goal, the authors (1) analyzed the provisions related to extension of time under standard design-build contracts published by a range of professional bodies and institutions; (2) highlighted the differences and commonalities among the studied contracts in a comparative analysis form; and (3) developed a checklist of causes and questions to provide an easy-to-use systematic process to allow for a more robust process for managing claims for extension of time. The presented checklist acts as a tool for assessing and enhancing contract administration for extension of time under design-build contracts. The checklist also provides associated parties with guidelines for drafting contractual clauses related to extension of time under new design-build contracts. This study is expected to promote effective and efficient contract administration of requests for extension of time, thus minimizing conflicts, claims, and disputes as well as enabling associated parties to mitigate the related time and cost negative impacts on their projects.
    • Download: (358.8Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Understanding Extension of Time under Different Standard Design-Build Forms of Contract

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4265914
    Collections
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction

    Show full item record

    contributor authorIslam H. El-adaway
    contributor authorRicky A. Vance
    contributor authorIbrahim S. Abotaleb
    date accessioned2022-01-30T19:45:12Z
    date available2022-01-30T19:45:12Z
    date issued2020
    identifier other%28ASCE%29LA.1943-4170.0000331.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4265914
    description abstractContractual provisions related to delay and extension of time are often written in difficult language or presented in a scattered manner in construction contracts. This could lead to confusion and misunderstanding by the different parties as to rights and responsibilities. Thus, it is not surprising that poor contract administration is always listed among the top reasons for conflicts, claims, and disputes in the construction industry. The goal of this paper is to present contract administration guidelines for appropriate utilization of the provisions related to extension of time under the most widely used standard design-build contracts. This is particularly valuable bearing in mind the complexity of addressing construction delays in general, as well as the growing popularity of design-build delivery methods in particular. To address this goal, the authors (1) analyzed the provisions related to extension of time under standard design-build contracts published by a range of professional bodies and institutions; (2) highlighted the differences and commonalities among the studied contracts in a comparative analysis form; and (3) developed a checklist of causes and questions to provide an easy-to-use systematic process to allow for a more robust process for managing claims for extension of time. The presented checklist acts as a tool for assessing and enhancing contract administration for extension of time under design-build contracts. The checklist also provides associated parties with guidelines for drafting contractual clauses related to extension of time under new design-build contracts. This study is expected to promote effective and efficient contract administration of requests for extension of time, thus minimizing conflicts, claims, and disputes as well as enabling associated parties to mitigate the related time and cost negative impacts on their projects.
    publisherASCE
    titleUnderstanding Extension of Time under Different Standard Design-Build Forms of Contract
    typeJournal Paper
    journal volume12
    journal issue1
    journal titleJournal of Legal Affairs and Dispute Resolution in Engineering and Construction
    identifier doi10.1061/(ASCE)LA.1943-4170.0000331
    page04519031
    treeJournal of Legal Affairs and Dispute Resolution in Engineering and Construction:;2020:;Volume ( 012 ):;issue: 001
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian