YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Generating a Daily Bill of Materials at Level of Development 400 Using the Smallest Workface Boundary

    Source: Journal of Construction Engineering and Management:;2020:;Volume ( 146 ):;issue: 005
    Author:
    Min Ho Song
    ,
    Martin Fischer
    DOI: 10.1061/(ASCE)CO.1943-7862.0001815
    Publisher: ASCE
    Abstract: Observations and sample tests at five construction sites showed that the time required for generating a daily bill of materials (BOM) is within the range of 12–68 min. However, 20 foremen interviewed at the sites stated that, in reality, they cannot spend more than 2–3 min per day generating a daily BOM, although this information would be helpful for field control. To meet this time requirement, this study uses a building information model at level of development (LOD) 400, i.e., the fabrication level, and a concept referred to as the smallest workface boundary (SWFB), which is the boundary that encapsulates a set of LOD400 objects in the smallest workable unit to overcome their high granularity. This research also presents four types of rules to automate the generation of SWFBs to the extent possible from LOD400 objects. The SWFB concept and rules are incorporated into a protype to aid a foreman in quickly generating a daily BOM with LOD400 objects. A methodology that a foreman can use with the prototype is also provided. For validation, field experiments were conducted at sites in Abu Dhabi, Stockholm, and Lima. With the latest version of the prototype, the time requirement (i.e., not requiring more than 2–3 min per day) was met with an average of 59 s.
    • Download: (3.485Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Generating a Daily Bill of Materials at Level of Development 400 Using the Smallest Workface Boundary

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4265186
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorMin Ho Song
    contributor authorMartin Fischer
    date accessioned2022-01-30T19:22:46Z
    date available2022-01-30T19:22:46Z
    date issued2020
    identifier other%28ASCE%29CO.1943-7862.0001815.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4265186
    description abstractObservations and sample tests at five construction sites showed that the time required for generating a daily bill of materials (BOM) is within the range of 12–68 min. However, 20 foremen interviewed at the sites stated that, in reality, they cannot spend more than 2–3 min per day generating a daily BOM, although this information would be helpful for field control. To meet this time requirement, this study uses a building information model at level of development (LOD) 400, i.e., the fabrication level, and a concept referred to as the smallest workface boundary (SWFB), which is the boundary that encapsulates a set of LOD400 objects in the smallest workable unit to overcome their high granularity. This research also presents four types of rules to automate the generation of SWFBs to the extent possible from LOD400 objects. The SWFB concept and rules are incorporated into a protype to aid a foreman in quickly generating a daily BOM with LOD400 objects. A methodology that a foreman can use with the prototype is also provided. For validation, field experiments were conducted at sites in Abu Dhabi, Stockholm, and Lima. With the latest version of the prototype, the time requirement (i.e., not requiring more than 2–3 min per day) was met with an average of 59 s.
    publisherASCE
    titleGenerating a Daily Bill of Materials at Level of Development 400 Using the Smallest Workface Boundary
    typeJournal Paper
    journal volume146
    journal issue5
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)CO.1943-7862.0001815
    page04020035
    treeJournal of Construction Engineering and Management:;2020:;Volume ( 146 ):;issue: 005
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian