YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Factors Affecting the Utilization of Big Data in Construction Projects

    Source: Journal of Construction Engineering and Management:;2020:;Volume ( 146 ):;issue: 005
    Author:
    Tao Yu
    ,
    Xin Liang
    ,
    Yaowu Wang
    DOI: 10.1061/(ASCE)CO.1943-7862.0001807
    Publisher: ASCE
    Abstract: With the rapid development of information and communication technologies, big data is expected to enable the creation of new paradigms for construction project management and improve the efficiency of design and construction activities. In practice, a few factors with complex impacts on each other can significantly affect the utilization of big data in construction projects. Practitioners should comprehensively examine these factors when shaping strategies for promoting the use of big data in their projects. This study aimed to identify factors that significantly impact the utilization of big data and investigate how these factors influence each other. First, a factor list was compiled based on a literature analysis and semistructured interviews with experts. Then, the nominal group technique was used to map interactions among the identified factors in an adjacency matrix, and interpretive structure modeling was used for further analysis. Finally, these factors were grouped into four categories with respect to their driving and dependence powers. Suggestions were made for promoting the utilization of big data in construction projects. The results indicate that incentive policies and the ethics and legal mechanisms of copyright, privacy, and data security are the most important factors that must be carefully considered by project managers and engineers when formulating strategies for utilizing big data in their projects.
    • Download: (1.157Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Factors Affecting the Utilization of Big Data in Construction Projects

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4265180
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorTao Yu
    contributor authorXin Liang
    contributor authorYaowu Wang
    date accessioned2022-01-30T19:22:35Z
    date available2022-01-30T19:22:35Z
    date issued2020
    identifier other%28ASCE%29CO.1943-7862.0001807.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4265180
    description abstractWith the rapid development of information and communication technologies, big data is expected to enable the creation of new paradigms for construction project management and improve the efficiency of design and construction activities. In practice, a few factors with complex impacts on each other can significantly affect the utilization of big data in construction projects. Practitioners should comprehensively examine these factors when shaping strategies for promoting the use of big data in their projects. This study aimed to identify factors that significantly impact the utilization of big data and investigate how these factors influence each other. First, a factor list was compiled based on a literature analysis and semistructured interviews with experts. Then, the nominal group technique was used to map interactions among the identified factors in an adjacency matrix, and interpretive structure modeling was used for further analysis. Finally, these factors were grouped into four categories with respect to their driving and dependence powers. Suggestions were made for promoting the utilization of big data in construction projects. The results indicate that incentive policies and the ethics and legal mechanisms of copyright, privacy, and data security are the most important factors that must be carefully considered by project managers and engineers when formulating strategies for utilizing big data in their projects.
    publisherASCE
    titleFactors Affecting the Utilization of Big Data in Construction Projects
    typeJournal Paper
    journal volume146
    journal issue5
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)CO.1943-7862.0001807
    page04020032
    treeJournal of Construction Engineering and Management:;2020:;Volume ( 146 ):;issue: 005
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian