YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Improving Effectiveness of Constraints Removal in Construction Planning Meetings: Information-Theoretic Approach

    Source: Journal of Construction Engineering and Management:;2020:;Volume ( 146 ):;issue: 004
    Author:
    Ashtad Javanmardi
    ,
    S. Alireza Abbasian-Hosseini
    ,
    Min Liu
    ,
    Simon M. Hsiang
    DOI: 10.1061/(ASCE)CO.1943-7862.0001790
    Publisher: ASCE
    Abstract: Timely identification and removal of constraints is critical for improving workflow reliability. Construction project managers need to spend a significant amount of working time in various types of planning meetings to discuss, analyze, and remove constraints. However, the amount of uncertainty associated with each constraint, mutual information shared among constraints, and any information gained by addressing those constraints are not necessarily known with any great accuracy or precision. This research used a bridge construction project as a case study to collect empirical data on detailed weekly meeting minutes over 18 weeks and the planned and actual starting and finish times of 475 activities. An information-theoretic approach was used to develop a framework to measure the amount of uncertainty and information sharing among constraint discussions. A Chow–Liu tree was then developed to help project managers optimize the sequence of topics discussed so that meeting time may be spent more productively. Results from this particular study indicate that weekly planning meetings need to strategically address issues of equipment availability, design and working method clarification, and prerequisite work readiness since removing those constraints could improve workflow reliability by 5.6%, 4.9%, and 3.6%, respectively. The contribution to the body of knowledge of this research was the development of a framework to utilize an information theoretic–based approach to measure information exchange, uncertainty, and sharing in construction planning meetings. The method can be applied to other construction projects, and the findings can help project managers plan and run meetings more effectively.
    • Download: (919.8Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Improving Effectiveness of Constraints Removal in Construction Planning Meetings: Information-Theoretic Approach

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4265162
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorAshtad Javanmardi
    contributor authorS. Alireza Abbasian-Hosseini
    contributor authorMin Liu
    contributor authorSimon M. Hsiang
    date accessioned2022-01-30T19:22:03Z
    date available2022-01-30T19:22:03Z
    date issued2020
    identifier other%28ASCE%29CO.1943-7862.0001790.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4265162
    description abstractTimely identification and removal of constraints is critical for improving workflow reliability. Construction project managers need to spend a significant amount of working time in various types of planning meetings to discuss, analyze, and remove constraints. However, the amount of uncertainty associated with each constraint, mutual information shared among constraints, and any information gained by addressing those constraints are not necessarily known with any great accuracy or precision. This research used a bridge construction project as a case study to collect empirical data on detailed weekly meeting minutes over 18 weeks and the planned and actual starting and finish times of 475 activities. An information-theoretic approach was used to develop a framework to measure the amount of uncertainty and information sharing among constraint discussions. A Chow–Liu tree was then developed to help project managers optimize the sequence of topics discussed so that meeting time may be spent more productively. Results from this particular study indicate that weekly planning meetings need to strategically address issues of equipment availability, design and working method clarification, and prerequisite work readiness since removing those constraints could improve workflow reliability by 5.6%, 4.9%, and 3.6%, respectively. The contribution to the body of knowledge of this research was the development of a framework to utilize an information theoretic–based approach to measure information exchange, uncertainty, and sharing in construction planning meetings. The method can be applied to other construction projects, and the findings can help project managers plan and run meetings more effectively.
    publisherASCE
    titleImproving Effectiveness of Constraints Removal in Construction Planning Meetings: Information-Theoretic Approach
    typeJournal Paper
    journal volume146
    journal issue4
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)CO.1943-7862.0001790
    page04020015
    treeJournal of Construction Engineering and Management:;2020:;Volume ( 146 ):;issue: 004
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian