YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Conceptual Quantities Estimation Using Bootstrapped Support Vector Regression Models

    Source: Journal of Construction Engineering and Management:;2020:;Volume ( 146 ):;issue: 004
    Author:
    Oluwafunmibi Seun Idowu
    ,
    Ka Chi Lam
    DOI: 10.1061/(ASCE)CO.1943-7862.0001780
    Publisher: ASCE
    Abstract: Conceptual cost models do not provide details of materials, equipment, or personnel that make up construction cost. Therefore, obtaining project details for early resource planning and cost control is difficult. A feasible solution to providing valuable details for early resource planning and cost control is to model a constituent part of construction cost, i.e., quantities. Hence, the development of models for predicting conceptual quantities of reinforced concrete structural elements is the aim of the current study. Using design parameters such as live load and soil bearing pressure, predictors were defined and used for constructing conceptual quantity models. A framework for range estimation of conceptual structural quantities using support vector regression was also presented. A total of 12 models were developed using a combination of nonparametric support vector regression and bootstrap resampling techniques. The of out-of-sample prediction intervals showed that bootstrapped support vector regression models can provide useful conceptual quantity estimates. The predicted quantities intervals can assist construction planners in early resource planning and enable performance measurement of early cost predictions throughout the construction process. This study presents two additional contributions to the existing body of knowledge apart from the proposed framework. First, an overlooked predictor variable in the literature for conceptual structural quantities, the gross soil reaction, was shown to be a good predictor of foundation quantities. Second, it shows that conceptual low-level bills of quantities estimates can be provided without sketch drawings—a necessity for measuring scope creep throughout the development of a building project.
    • Download: (598.7Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Conceptual Quantities Estimation Using Bootstrapped Support Vector Regression Models

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4265151
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorOluwafunmibi Seun Idowu
    contributor authorKa Chi Lam
    date accessioned2022-01-30T19:21:42Z
    date available2022-01-30T19:21:42Z
    date issued2020
    identifier other%28ASCE%29CO.1943-7862.0001780.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4265151
    description abstractConceptual cost models do not provide details of materials, equipment, or personnel that make up construction cost. Therefore, obtaining project details for early resource planning and cost control is difficult. A feasible solution to providing valuable details for early resource planning and cost control is to model a constituent part of construction cost, i.e., quantities. Hence, the development of models for predicting conceptual quantities of reinforced concrete structural elements is the aim of the current study. Using design parameters such as live load and soil bearing pressure, predictors were defined and used for constructing conceptual quantity models. A framework for range estimation of conceptual structural quantities using support vector regression was also presented. A total of 12 models were developed using a combination of nonparametric support vector regression and bootstrap resampling techniques. The of out-of-sample prediction intervals showed that bootstrapped support vector regression models can provide useful conceptual quantity estimates. The predicted quantities intervals can assist construction planners in early resource planning and enable performance measurement of early cost predictions throughout the construction process. This study presents two additional contributions to the existing body of knowledge apart from the proposed framework. First, an overlooked predictor variable in the literature for conceptual structural quantities, the gross soil reaction, was shown to be a good predictor of foundation quantities. Second, it shows that conceptual low-level bills of quantities estimates can be provided without sketch drawings—a necessity for measuring scope creep throughout the development of a building project.
    publisherASCE
    titleConceptual Quantities Estimation Using Bootstrapped Support Vector Regression Models
    typeJournal Paper
    journal volume146
    journal issue4
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)CO.1943-7862.0001780
    page04020018
    treeJournal of Construction Engineering and Management:;2020:;Volume ( 146 ):;issue: 004
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian