YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Joint Contract–Function Effects on BIM-Enabled EPC Project Performance

    Source: Journal of Construction Engineering and Management:;2020:;Volume ( 146 ):;issue: 003
    Author:
    Cen-Ying Lee
    ,
    Heap-Yih Chong
    ,
    Qian Li
    ,
    Xiangyu Wang
    DOI: 10.1061/(ASCE)CO.1943-7862.0001766
    Publisher: ASCE
    Abstract: Engineering, procurement, and construction (EPC) contracting does not promote collaboration and thus may not be suitable for building information modeling (BIM) projects. Joint-contract functions that combine contractual control, coordination, and contingency adaptability may positively influence the performance of these BIM-enabled projects. This study hypothesized that perceived fairness, calculative trust, relational trust, and positive outcomes of distrust influence the relationship between joint-contract functions and BIM-enabled project performance. A total of 252 observations were collected from industry practitioners in EPC oil and gas projects and analyzed using partial least-squares structural equation modeling (PLS-SEM). The results show no direct effect of joint-contract functions on BIM-enabled EPC project performance but do show significant total and indirect relationship effects that are influenced by perceived fairness and relational trust. The findings contribute to construction contracting research by empirically showing how formal contracts focusing on joint-contract functions can influence BIM-enabled EPC project performance. The current findings also shed light on appropriate contract framing for BIM-enabled EPC project stakeholders, an area not explored in the previous literature.
    • Download: (789.6Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Joint Contract–Function Effects on BIM-Enabled EPC Project Performance

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4265139
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorCen-Ying Lee
    contributor authorHeap-Yih Chong
    contributor authorQian Li
    contributor authorXiangyu Wang
    date accessioned2022-01-30T19:21:26Z
    date available2022-01-30T19:21:26Z
    date issued2020
    identifier other%28ASCE%29CO.1943-7862.0001766.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4265139
    description abstractEngineering, procurement, and construction (EPC) contracting does not promote collaboration and thus may not be suitable for building information modeling (BIM) projects. Joint-contract functions that combine contractual control, coordination, and contingency adaptability may positively influence the performance of these BIM-enabled projects. This study hypothesized that perceived fairness, calculative trust, relational trust, and positive outcomes of distrust influence the relationship between joint-contract functions and BIM-enabled project performance. A total of 252 observations were collected from industry practitioners in EPC oil and gas projects and analyzed using partial least-squares structural equation modeling (PLS-SEM). The results show no direct effect of joint-contract functions on BIM-enabled EPC project performance but do show significant total and indirect relationship effects that are influenced by perceived fairness and relational trust. The findings contribute to construction contracting research by empirically showing how formal contracts focusing on joint-contract functions can influence BIM-enabled EPC project performance. The current findings also shed light on appropriate contract framing for BIM-enabled EPC project stakeholders, an area not explored in the previous literature.
    publisherASCE
    titleJoint Contract–Function Effects on BIM-Enabled EPC Project Performance
    typeJournal Paper
    journal volume146
    journal issue3
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)CO.1943-7862.0001766
    page04020008
    treeJournal of Construction Engineering and Management:;2020:;Volume ( 146 ):;issue: 003
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian